CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Washington construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$17,157,963,338
Bid Phase:$565,681,370
Post-Bid:$69,992,562,489
Civil Projects (value)
Pre-Bid Phase:$1,376,961,322
Bid Phase:$681,342,653
Post-Bid:$24,085,114,418



Fencing Project Case Study in Washington

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in Washington are also available.

Project Overview

Project Title:WADOT 2 2 & 2 3 MILES EAST BERGEN RD
Estimated Value:$377,495
The cost to build fencing in Washington depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Washington
County:Skamania
City:Carson
Address:MP 54 60 To MP 54 77

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing LUMP SUM MOBILIZATION 1 2500 C.Y. ROADWAY EXCAVATION INCL. HAUL 2 8 DAY ESC LEA 3 20 L.F. WATTLE 4 1000 EST. EROSION/WATER POLLUTION CONTROL 5 LUMP SUM OTHER TEMPORARY TRAFFIC CONTROL 6 840 HR FLAGGERS AND SPOTTERS 7 70 HR OTHER TRAFFIC CONTROL LABOR 8 LUMP SUM TRAFFIC CONTROL SUPERVISOR 9 96 S.F. CONSTRUCTION SIGN CLASS A 10 5000 EST. FORCE ACCOUNT VISUAL MITIGATION 11 9 C.Y. SHOTCRETE FOR ROCK/SOIL SLOPE STABIL1I2ZATION 350 L.F. FLEXIBLE ROCKFALL FENCE 13 70000 EST. FORCE ACCOUNT STONE WALL REPAIR 14 800 S.F. MODIFIED ROCKFALL FENCE SLOPE PROTEC1T5ION 225 L.F. ROCK BOLT 16 110 L.F. INSTALL TYPE 1 ROCK DOWEL 17 100 CRHR SLOPE SCALING 18 2000 EST. ROADSIDE CLEANUP 19 5 EST. REIMBURSEMENT FOR THIRD PARTY DAMAGE 20-2 CALC MINOR CHANGE 21 LUMP SUM SPCC PLAN 22 BIDDERS AND BIDS BIDDER TOTAL BIDDER TOTAL TOTAL BIDDER TOTAL BIDDER TOTAL BIDDER TOTAL BID OPENING DATE:BIDDER PROJECT ESTIMATE:APPARENT 3 LOW BIDDERS 04/26/2006 LOCATION:SKAMANIA