CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Texas construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$57,257,929,934
Bid Phase:$913,042,475
Post-Bid:$246,523,390,435
Civil Projects (value)
Pre-Bid Phase:$13,995,865,814
Bid Phase:$564,633,054
Post-Bid:$87,800,928,322



Fencing Project Case Study in Texas

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in Texas are also available.

Project Overview

Project Title:TXDOT US 59 CABLE BARRIER SYSTEM
Estimated Value:$699,801
The cost to build fencing in Texas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Texas
County:Liberty
Address:US 59

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing 132 2023 EMBANKMENT (VEHICLE)(ORD COMP)(TY D) CY 351.000 134 2002 BACKFILL (TY B) STA 216.200 164 2023 002 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 30,736.000 164 2029 002 CELL FBR MLCH SEED(TEMP)(WARM) SY 15,372.000 164 2031 002 CELL FBR MLCH SEED(TEMP)(COOL) SY 15,372.000 166 2002 001 FERTILIZER TON 3.190 168 2001 VEGETATIVE WATERING MG 172.000 432 2039 RIPRAP (MOW STRIP)(4 IN) CY 1,067.000 464 2003 RC PIPE (CL III)(18 IN) LF 20.000 465 2003 001 INLET (COMPL)(TY H) EA 5.000 496 2002 REMOV STR (INLET) EA 5.000 496 2007 REMOV STR (PIPE) LF 20.000 500 2001 004 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 506 2016 011 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 468.000 506 2019 011 CONSTRUCTION EXITS (REMOVE) SY 468.000 506 2024 011 BACKHOE WORK (EROSION & SEDM CONT) HR 5.500 5049 2002 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 1,060.000 5367 2002 CABLE BARRIER SYSTEM (TL-4) LF 20,829.000 5367 2008 CABL BARRIER TERMINAL SECTION (TL-4) EA 14.000