Fencing Project Case Study in Texas

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in Texas are also available.

Project Overview

Project Title:TXDOT IH 35 FENCE
Estimated Value:$4,110,500
The cost to build fencing in Texas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Texas
County:Webb
City:Laredo
Address:IH 35

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing 104 2009 REMOVING CONC (RIPRAP) SY 2,543.000 104 2021 REMOVING CONC (CURB) LF 5,925.000 110 2001 EXCAVATION (ROADWAY) CY 517.000 132 2001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 1,046.000 420 2002 003 CL B CONC (FLUME) CY 11.500 420 2013 003 CL C CONC (MISC) CY 5.700 429 2001 CONC STRUCT REPAIR SF 4.000 432 2035 RIPRAP (CONC)(6 IN) CY 254.000 432 2040 RIPRAP (MOW STRIP)(5 IN) CY 1,176.000 450 2021 RAIL (TY T101RC) LF 2,468.000 452 2002 REMOV RAIL (METAL ELEMENTS) LF 2,080.000 464 2007 RC PIPE (CL III)(30 IN) LF 8.000 464 2010 RC PIPE (CL III)(42 IN) LF 8.000 467 2101 SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C) EA 10.000 467 2102 SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C) EA 1.000 467 2108 SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C) EA 4.000 467 2110 SET (TY I)(S= 4 FT)(HW= 6 FT)(4:1)(C) EA 2.000 467 2113 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C) EA 2.000 46 2114 SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1)(C) EA 18.000 467 2115 SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1)(C) EA 6.000 467 2119 SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C) E 4.000 467 2120 SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C) EA 2.000 467 2121 SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1)(C) EA 6.000 467 2122 SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1)(C) EA 4.000 467 2125 SET (TY I)(S= 7 FT)(HW= 3 FT)(4:1)(C) EA 4.000 46 2126 SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1)(C) EA 2.000 467 2131 SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1)(C) EA 14.000 467 2225 SET (TY II)(30 IN)(RCP)(4:1)(C) EA 2.000 467 2228 SET (TY II)(42 IN)(RCP)(4:1)(C) EA 2.000 467 2234 SET (TY II)(18 IN)(RCP)(6:1)(C) EA 4.000 467 2262 SET (TY II)(24 IN)(CMP)(4:1)(C) EA 2.000 467 2273 SET (TY II)(18 IN)(CMP)(6:1)(C) EA 12.000 479 2002 ADJ INLETS EA 6.000 500 2001 MOBILIZATION LS 1.000 502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 506 2034 TEMPORARY SEDIMENT CONTROL FENCE LF 25,773.000 540 2001 MTL W-BEAM GD FEN (TIM POST) LF 18,825.000 540 2005 TERMINAL ANCHOR SECTION EA 2.00 540 2011 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 24.000 540 2013 MTL BEAM GD FEN TRANS (T101) EA 78.000 542 2001 REMOVING METAL BEAM GUARD FENCE LF 19,818.000 544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 136.000 658 2261 INSTL DEL ASSM (D-SW)SZ (TYC)GF1(BI) EA 824.000 658 2316 INSTL OM ASSM (OM-2Z)(FLX)GND EA 184.000 776 2024 REP MTL PST W/BASE PLATE (TY T101RC) EA 2.000 4181 2001 RELOCATE MTL RAIL POST (W/ BASE PLATE) EA 6.000 4181 2002 INSTALL MTL RAIL POST (W/ BASE PLATE) EA 6.000 5332 2001 CABLE BARRIER SYSTEM (TL-4)(6'-8") LF 4,571.500 5332 2002 CABLE BARRIER TERMINAL SECTION (TL-4) EA 4.000