Fencing Project Case Study in Texas

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in Texas are also available.

Project Overview

Project Title:TXDOT IH 20 WIREROPE CABLE MEDIAN BARRIE
Estimated Value:$2,806,140
The cost to build fencing in Texas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Texas
County:Kaufman
City:Crandall
Address:IH 20

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing 132 2021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 2,374.000 150 2001 BLADING STA 2,378.000 162 2002 BLOCK SODDING SY 11,566.000 164 2004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC 68.210 168 2001 VEGETATIVE WATERING MG 12,457.800 500 2001 MOBILIZATION LS 1.000 502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 540 2001 MTL W-BEAM GD FEN (TIM POST) LF 4,175.000 540 2005 TERMINAL ANCHOR SECTION EA 5.000 542 2001 REMOVING METAL BEAM GUARD FENCE LF 700.000 542 2002 REMOVING TERMINAL ANCHOR SECTION EA 14.000 544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 6.000 658 2241 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA 44.000 5049 2002 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 4,480.000 5278 2001 CABLE BARRIER SYSTEM TYPE(TL-4) L 184,086.000 5278 2002 CABLE BARRIER TERMI SECTION TYPE(TL-4) EA 102.000 5278 2003 CABLE BARRIER TERMINAL SECTION (TL-3) EA 54.000 5278 2004 CABLE BARRIER SYSTEM (TL-3) LF 49,521.000