CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Pennsylvania construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$24,485,577,809
Bid Phase:$675,805,243
Post-Bid:$94,253,398,511
Civil Projects (value)
Pre-Bid Phase:$2,517,637,057
Bid Phase:$333,398,332
Post-Bid:$35,438,855,103



Fencing Project Case Study in Pennsylvania

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in Pennsylvania are also available.

Project Overview

Project Title:PADOT VARIOUS GUIDE RAIL
Start Date:2008-12-01
Estimated Value:$226,624
The cost to build fencing in Pennsylvania depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Pennsylvania
County:Tioga

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing For the installation of guide rail at unprotected bridge ends and other miscellaneous construction all as indicated on the approved drawings included in the bid package for GROUP 3-08-UBE,VARIOUS ROUTES and VARIOUS MUNICIPALITIES in BRADFORD,COLUMBIA,LYCOMING,MONTOUR,and TIOGA COUNTIES. 0350-0121 Ton 6.000 01 Adhoc SUBBASE(NO. 2A)C,E 0608-0001 Lump Sum 1.000 01 MOBILIZATION X 0619-0550 Each 4.000 03 PERMANENT IMPACT ATTENUATING DEVICE,TYPE I,TEST LEVEL 3 J3 0619-0570 Each 6.000 01 PERMANENT IMPACT ATTENUATING DEVICE,TYPE III,TEST LEVEL 3 J3 0620-0400 Each 13.000 01 TERMINAL SECTION,SINGLE J 0620-0402 Each 1.000 06 TERMINAL SECTION,BRIDGE CONNECTION J 4620-0402 Each 16.000 01 Yes Adhoc TERMINAL SECTION,BRIDGE CONNECTION(MODIFIED)J 0620-0500 Linear Foot 75.000 06 RESET GUIDE RAIL J 0620-0503 Linear Foot 5,575.000 03 REMOVE EXISTING GUIDE RAIL(CONTRACTOR'S PROPERTY)J 4620-0525 Each 32.000 06 Yes Adhoc OFFSET BRACKETS(MODIFIED)J 0620-0575 Linear Foot 559.000 01 GUIDE RAIL ELEMENT J 0620-0585 Linear Foot 538.000 01 RUBBING RAIL J 0620-1025 Linear Foot 188.000 05 TYPE 2-W GUIDE RAIL J 0620-1026 Each 3.000 05 TYPE 2-WEAK POST END TREATMENT J 0620-1075 Linear Foot 6,854.000 01 TYPE 2-S GUIDE RAIL J 0620-1100 Linear Foot 600.000 01 TYPE 2-SC GUIDE RAIL J 0620-1125 Linear Foot 550.000 01 TYPE 2-SCC GUIDE RAIL J 0620-1250 Each 24.000 01 TYPE 2 STRONG POST END TREATMENT J 0689-0001 Lump Sum 1.000 01 NARRATIVE SCHEDULE X 0845-0001 Dollar 500.000 $1.0000 01 $500.0000 Yes UNFORESEEN WATER POLLUTION CONTROL C1,H,M2 0901-0001 Lump Sum 1.000 01 Standard MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION Q 0935-0001 Square Foot 27.000 01 POST MOUNTED SIGNS,TYPE F R 0937-0112 Each 3.000 01 GUIDE RAIL MOUNTED DELINEATOR TYPE D,(Y/B)R 0937-0113 Each 124.000 01 GUIDE RAIL MOUNTED DELINEATOR TYPE D,(W/B)R 0937-0330 Each 50.000 01 FLEXIBLE DELINEATOR POST,GROUND-MOUNT TYPE GM-2,WHITE POST WITH WHITE/BLANK SHEETING R 0975-0001 Each 28.000 01 REMOVE POST MOUNTED SIGNS,TYPE F R 9620-0550 Each 1.000 07 Adhoc REMOVE EXISTING POSTS(CONTRACTOR'S PROPERTY)J