Fencing Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in California are also available.

Project Overview

Project Title:CADOT SOLDIER PILE RETAINING WALL
Estimated Value:$2,537,790
The cost to build fencing in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:Santa Barbara
City:Lompoc
Address:S Of El Jaro Crk Br To N Of El Jaro Crk

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing 1 071325 TEMPORARY FENCE(TYPE ESA)M 260 2 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS LUMP SUM 3 074020 WATER POLLUTION CONTROL LS LUMP SUM 4 074029 TEMPORARY SILT FENCE M 260 5 074032 TEMPORARY CONCRETE WASHOUT FACILITY EA 1 6 074033 TEMPORARY CONSTRUCTION ENTRANCE EA 2 7 074034 TEMPORARY COVER M2 4000 8(S)120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 9(S)120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 10(S)128650 PORTABLE CHANGEABLE MESSAGE SIGN LS LUMP SUM 11 150206 ABANDON CULVERT M 27 12(S)150606 REMOVE FENCE(TYPE BW)M 1830 13(S)034747 REMOVE TERMINAL SYSTEM(TYPE SRT)EA 1 14(S)150662 REMOVE METAL BEAM GUARD RAILIN M 150 15 150668 REMOVE FLARED END SECTION EA 1 16 150771 REMOVE ASPHALT CONCRET DIKE M 450 17 151274 SALVAGE CONCRETE BARRIER(TYPE K)M 67 18(S)153103 COLD PLAN ASPHALT CONCRETE PAVEMENT M2 540 19(S)158101 SALVAGE CRASH CUSHION MODULES EA 1 20 160101 CLEARING AND GRUBBING LS LUMP SUM 21 190101 ROADWAY EXCAVATION M3 200 22(F)192049 STRUCTURE EXCAVATION(SOLDIER PILE WALL)M3 550 23(F)193029 STRUCTURE BACKFILL(SOLDIER PILE WALL)M3 345 24(F)193119 LEAN CONCRETE BACKFILL M3 400 25 198001 IMPORTED BORROW M3 480 26 198007 IMPORTED MATERIAL(SHOULDER BACKING)TONN 200 27(S)203001 EROSION CONTROL(BLANKET)M2 7900 28(S)034748 BONDED FIBER MATRIX(EROSION CONTROL)KG 2370 29(S)203021 FIBER ROLLS M 2500 30(S)203024 COMPOST(EROSION CONTROL)M3 2 31(S)203026 MOVE-IN/MOVE-OUT(EROSION CONTROL)EA 1 32(S)203045 PURE LIVE SEED(EROSION CONTROL)KG 40 33 260201 CLASS 2 AGGREGATE BASE M3 280 34 390102 ASPHALT CONCRETE(TYPE A)TONN 640 35 394040 PLACE ASPHALT CONCRETE DIKE(TYPE A)M 180 36 394044 PLACE ASPHALT CONCRETE DIKE(TYPE C)M 22 37 394048 PLACE ASPHALT CONCRETE DIKE(TYPE E)M 240 38 394049 PLACE ASPHALT CONCRET DIKE(TYPE F)M 25 39 397001 ASPHALTIC EMULSION(PAINT BINDER)TONN 2.1 40 049870 STEEL SOLDIER PILE(HP 360X132)M 1639 41 049871 1.2 M DRILLED HOLE M 820 42(S)500050 TIEBACK ANCHOR EA 115 43(F)049872 CLASS 2 CONCRETE(BACKFILL)M3 530 44(F)510502 MINOR CONCRETE(MINOR STRUCTURE)M3 2.9 45(F)049873 MINOR CONCRETE(COPING)M3 37 46(F)530100 SHOTCRETE M3 105 47 566012 ROADSIDE SIGN-TWO POST EA 1 48(F)575004 TIMBER LAGGING M3 90 49 641136 600 MM PLASTIC PIPE M 140 50 664021 600 MM CORRUGATED STEEL PIPE(2.77 MM THICK)M 17 51 705045 600 MM STEE FLARED END SECTION EA 1 52(F)731517 MINOR CONCRETE(GUTTER)M 86 53(F)750001 MISCELLANEOUS IRON AND STEEL KG 278 54(S)800007 FENCE(TYPE BW,5 STRAND,METAL POST)M 1830 55 820107 DELINEATOR(CLASS 1)EA 3 56 820118 GUARD RAILING DELINEATO EA 8 57 820151 OBJECT MARKER(TYPE L-1)EA 1 58(S)832002 METAL BEAM GUARD RAILING(STEEL POST)M 210 59(S-F)839521 CABLE RAILING M 86 60(S)839585 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1 61(S)840560 THERMOPLASTIC TRAFFIC STRIPE(SPRAYABLE)M 1020 62(S)850111 PAVEMENT MARKER(RETROREFLECTIVE)EA 96 63 999990 MOBILIZATION LS LUMP SUM