Fencing Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in California are also available.

Project Overview

Project Title:CADOT SOLDIER PILE RETAINING WALL
Estimated Value:$2,698,560
The cost to build fencing in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:Santa Barbara
City:Lompoc
Address:Ytias Crk Br To North Of Ytias Crk Br

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing 1 071325 TEMPORARY FENCE(TYPE ESA)M 650 2 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS LUMP SUM 3 074020 WATER POLLUTION CONTROL LS LUMP SUM 4 074029 TEMPORARY SILT FENCE M 350 5 074032 TEMPORARY CONCRETE WASHOUT FACILITY EA 2 6 074033 TEMPORARY CONSTRUCTION ENTRANCE EA 2 7 074034 TEMPORARY COVER M2 4000 8(S)120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 9(S)120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 10(S)128650 PORTABLE CHANGEABLE MESSAGE SIGN LS LUMP SUM 11 150606 REMOVE FENCE(TYPE BW)M 220 12 150662 REMOVE METAL BEAM GUARD RAILING M 5 13(S)153103 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 950 14 160101 CLEARING AND GRUBBING LS LUMP SUM 15 190101 ROADWAY EXCAVATION M3 3890 16(F)192049 STRUCTURE EXCAVATION(SOLDIER PILE WALL)M3 730 17(F)193029 STRUCTURE BACKFILL(SOLDIER PILE WALL)M3 435 18(F)193119 LEAN CONCRETE BACKFILL M3 500 19(S)200001 HIGHWAY PLANTING LS LUMP SUM 20(S)203001 EROSION CONTROL(BLANKET)M2 800 21(S)034702 BONDED FIBER MATRIX(EROSION CONTROL)KG 5400 22(S)203021 FIBER ROLLS M 340 23(S)203024 COMPOST(EROSION CONTROL)M3 4 24(S)203026 MOVE-IN/MOVE-OUT(EROSION CONTROL)EA 2 25(S)203045 PURE LIVE SEED(EROSION CONTROL)KG 90 26(S)204099 PLANT ESTABLISHMENT WORK LS LUMP SUM 27(S)208000 IRRIGATION SYSTEM LS LUMP SUM 28 260201 CLASS 2 AGGREGATE BASE M3 1340 29 390102 ASPHALT CONCRETE(TYPE A)TONN 1190 30 394040 PLACE ASPHALT CONCRETE DIKE(TYPE A)M 40 31 397001 ASPHALTIC EMULSION(PAINT BINDER)TONN 3.3 32 049864 STEEL SOLDIER PILE(HP 360X132)M 1968 3 049865 1.2 M DRILLED HOLE M 985 34(S)500050 TIEBACK ANCHOR EA 159 35(F)049866 CLASS 2 CONCRETE(BACKFILL)M3 610 36(F)049867 MINOR CONCRETE(COPING)M3 82 37(F)530100 SHOTCRETE M3 125 38(F)575004 TIMBER LAGGING M3 112 39(F)731517 MINO CONCRETE(GUTTER)M 189 40(S)800016 FENCE(TYPE BW,6 STRAND,METAL POST)M 220 41(S)832002 METAL BEAM GUARD RAILING(STEEL POST)M 250 42(S-F)839521 CABLE RAILING M 189 43(S)839584 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 1 44(S)839585 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1 45(S)840560 THERMOPLASTIC TRAFFIC STRIPE(SPRAYABLE)M 820 46(S)850111 PAVEMENT MARKER(RETROREFLECTIVE)EA 60 47 999990 MOBILIZATION LS LUMP SUM