Fencing Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in California are also available.

Project Overview

Project Title:CADOT THRIE BEAM BARRIER
Estimated Value:$4,310,000
The cost to build fencing in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:Ventura
City:Ventura
Address:Rte 101/126 Sep To Todd Barranca Br/Vari

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing 1 070012 PROGRESS SCHEDULE(CRITICAL PATH METHOD)LS LUMP SUM 2 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS LUMP SUM 3 074020 WATER POLLUTION CONTROL LS LUMP SUM 4(S)120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 5(S)120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 6(S)120165 CHANNELIZER(SURFACE MOUNTED)EA 33 7(S)120166 CHANNELIZER(SURFACE MOUNTED)(LEFT IN PLACE)EA 33 8(S)129100 TEMPORAR CRASH CUSHION MODULE EA 28 9 150662 REMOVE METAL BEAM GUARD RAILING M 940 10 034075 REMOVE SINGLE THRIE BEAM BARRIER M 42 11 150771 REMOVE ASPHALT CONCRETE DIKE M 1250 12 153210 REMOVE CONCRETE M3 6 13 034076 SALVAGE CRASH CUSHION(TYPE REACT 9CBB)EA 1 14 034077 SALVAGE CRASH CUSHION(SAND FILLED)EA 70 15 160101 CLEARING AND GRUBBING LS LUMP SUM 16 190101 ROADWAY EXCAVATION M3 5180 17 19011 LEAD COMPLIANCE PLAN LS LUMP SUM 18 390103 ASPHALT CONCRETE(TYPE B)TONN 940 19 394002 PLACE ASPHALT CONCRETE(MISCELLANEOUS AREA)M2 3960 20 394049 PLACE ASPHAL CONCRETE DIKE(TYPE F)M 1250 21(F)510502 MINOR CONCRETE(MINOR STRUCTURE)M3 7 22 820107 DELINEATOR(CLASS 1)EA 670 23 820180 INSTALL MEDIAN MILEAGE PANEL EA 100 24 839303 SINGLE THRIE BEAM BARRIER(STEEL POST)M 32 300 25 839312 DOUBLE THRIE BEAM BARRIER(STEEL POST)M 500 26 839540 TRANSITION RAILING(TYPE STB)EA 14 27 839555 END CAP EA 14 28 839571 RETURN CAP EA 4 29 839582 END ANCHOR ASSEMBLY(TYPE CA)EA 4 30(S)839601 CRASH CUSHION(TYPE CAT)EA 1 31(S)839602 CRASH CUSHION(TYPE CAT)BACKUP EA 1 32 840515 THERMOPLASTIC PAVEMENT MARKING M2 34 33 999990 MOBILIZATION LS LUMP SUM