Fencing Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in California are also available.

Project Overview

Project Title:CADOT THRIE BEAM BARRIER
Estimated Value:$451,345
The cost to build fencing in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:Kern
City:Bakersfield
Address:Rte 223/99 Dep To N Of Houghton Rd

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing 1 074017 PREPARE WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 2 074020 WATER POLLUTION CONTROL LS LUMP SUM 3(S)120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 4(S)120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 5(S)128650 PORTABLE CHANGEABLE MESSAGE SIGN LS LUMP SUM 6 150662 REMOVE METAL BEAM GUARD RAILING M 500 7 15066 REMOVE SINGLE METAL BEAM BARRIER M 60 8(S)156590 REMOVE CRASH CUSHION(SAND FILLED)EA 11 9 160101 CLEARING AND GRUBBING LS LUMP SUM 10 198001 IMPORTED BORROW M3 110 11 390101 ASPHALT CONCRETE TONN 10 12 839303 SINGLE THRIE BEAM BARRIER(STEEL POST)M 10 500 13 839312 DOUBLE THRIE BEAM BARRIER(STEEL POST)M 16 14 839581 END ANCHOR ASSEMBLY(TYPE SFT)EA 1 15(S)839601 CRASH CUSHION(TYPE CAT)EA 1 16(S)839602 CRASH CUSHION(TYPE CAT)BACKUP EA 1 17 999990 MOBILIZATION LS LUMP SUM