CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of California construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$202,631,432,920
Bid Phase:$5,205,384,871
Post-Bid:$384,942,067,110
Civil Projects (value)
Pre-Bid Phase:$19,895,204,396
Bid Phase:$1,751,408,695
Post-Bid:$95,489,603,204



Fencing Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in California are also available.

Project Overview

Project Title:CADOT METAL BEAM GUARD RAILING
Start Date:2004-12-01
Estimated Value:$4,810,000
The cost to build fencing in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:Los Angeles

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing 1 070012 PROGRESS SCHEDULE(CRITICAL PATH METHOD)LS LUMP SUM 2 070018 TIME-RELATED OVERHEAD LS LUMP SUM 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS LUMP SUM 4 074020 WATER POLLUTION CONTROL LS LUMP SUM 5(S)120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 6(S)120100 TRAFFIC CONTROL SYSTE LS LUMP SUM 7(S)129000 TEMPORARY RAILING(TYPE K)M 720 8 129100 TEMPORARY CRASH CUSHION MODULE EA 130 9 033548 TEMPORARY CRASH CUSHION(ADIEM)EA 2 10 033549 TEMPORARY CHANNELIZER(SURFACE MOUNTED)EA 140 11 150662 REMOVE METAL BEAM GUARD RAILING M 8130 12 150771 REMOVE ASPHALT CONCRETE DIKE M 6380 13 151572 RECONSTRUCT METAL BEAM GUARD RAILING M 170 14 152380 RELOCATE CHAIN LINK FENCE 75 15 153210 REMOVE CONCRETE M 340 16 160101 CLEARING AND GRUBBING LS LUMP SUM 17 190101 ROADWAY EXCAVATION M3 250 18 190110 LEAD COMPLIANCE PLAN LS LUMP SUM 19 198001 IMPORTED BORROW M3 530 20 390103 ASPHALT CONCRETE(TYPE B)TONN 440 21 394002 PLACE ASPHALT CONCRETE(MISCELLANEOUS AREA)M2 1590 22 394044 PLACE ASPHAL CONCRETE DIKE(TYPE C)M 5550 23 394049 PLACE ASPHALT CONCRETE DIKE(TYPE F)M 2350 24(F)510502 MINOR CONCRETE(MINOR STRUCTURE)M3 3.9 25 731502 MINOR CONCRETE(MISCELLANEOUS CONSTRUCTION)M3 20 26 832003 METAL BEAM GUARD RAILING(WOOD POST)M 5770 27 832061 METAL BEAM GUARD RAILING(2.1 M WOOD POST)M 1930 28 839559 TERMINAL SYSTEM(TYPE ET)EA 250 29 839565 TERMINAL SYSTEM(TYPE SRT)EA 160 30 839568 TERMINAL ANCHOR ASSEMBLY(TYPE SFT)EA 130 31 861502 MODIFY SIGNAL LS LUMP SUM 32 999990 MOBILIZATION LS LUMP SUM