Fencing Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in California are also available.

Project Overview

Project Title:CADOT CONCRETE BARRIER CONSTRUCTION
Start Date:2004-06-01
Estimated Value:$160,000
The cost to build fencing in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:Orange
City:Buena Park
Address:Burlington Northern & State Fe Rlrd Brdg

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing, Miscellaneous Civil 1 074017 PREPARE WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 2 074020 WATER POLLUTION CONTROL LS LUMP SUM 3(S)120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 4(S)120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 5(S)120159 TEMPORARY TRAFFIC STRIPE(PAINT)M 1660 6 120165 CHANNELIZER(SURFACE MOUNTED)EA 19 7(S)120300 TEMPORARY PAVEMENT MARKER EA 80 8(S)128650 PORTABLE CHANGEABLE MESSAGE SIGN EA 9 129000 TEMPORARY RAILING(TYPE K)M 280 10 129100 TEMPORARY CRASH CUSHION MODUL EA 22 11 129150 TEMPORARY TRAFFIC SCREEN M 280 12 150711 REMOVE PAINTED TRAFFIC STRIPE M 330 13 150714 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 260 14 150715 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 2 15 150722 REMOVE PAVEMENT MARKER EA 80 16 153215 REMOVE CONCRETE(CURB AND GUTTER)M 80 17 153222 REMOVE CONCRETE ISLAND(PORTIONS)M3 14 18 156590 REMOVE CRASH CUSHION(SAND FILLED)EA 28 19 16010 CLEARING AND GRUBBING LS LUMP SUM 20 190101 ROADWAY EXCAVATION M3 58 21 731502 MINOR CONCRETE(MISCELLANEOUS CONSTRUCTION)M3 24 22 839604 CRASH CUSHION(REACT 9CBB)EA 2 23 839705 CONCRETE BARRIER(TYPE 60E)M 20 24(S)840515 THERMOPLASTIC PAVEMENT MARKING M2 2 25(S)840561 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1120 26(S)840562 150 MM THERMOPLASTIC TRAFFIC STRIPE M 260 27(S)850111 PAVEMENT MARKER(RETROREFLECTIVE)EA 120