Fencing Project Case Study in Arizona

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in Arizona are also available.

Project Overview

Project Title:AZDOT TUBA CITY-FOUR CORNERS HWY (US160)
Start Date:2004-04-01
Estimated Value:$6,413,000
The cost to build bridges & culverts in Arizona depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arizona
County:Coconino
City:Tuba
Address:East Tuba City-Navajo County Line

Project Type

Building Category:Bridges & Culverts, Fencing
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Fencing Remove Bituminous Pavement (Milling) SQ. YD. 2,500 Roadway Excavation CU. YD. 20,144 Borrow CU. YD. 1,154 Aggregate Base, Class II CU. YD. 7,100 Asphaltic Concrete (Miscellaneous Structural) TON 6,360 Asphaltic Concrete (Asphalt-Rubber) TON 44,350 Asphaltic Concrete Friction Course (Asphalt-Rubber) TON 11,780 Asphalt Rubber Material TON 4,488 Pipe Corrugated Metal Various Size L. FT. 188 Sign Post Perforated Various Sizes L. FT. 700 Permanent Pavement Marking (Painted) L. FT. 306,820 Dual Component Pavement Marking (Epoxy) L. FT. 396,640 Guard Rail, W-Beam, Single Face L. FT. 2,300 Contractor Quality Control L SUM 1 Construction Surveying and Layout L. SUM 1 Ground-In-Rumble Strip (6 Inch) L. Ft. 235,180