Excavating & Grading Project Case Study in Wisconsin

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of excavating & grading projects in Wisconsin are also available.

Project Overview

Project Title:JANESVILLE NEW LANDFILL PROJECT
Estimated Value:$1,875,990
The cost to build water and sewage piping in Wisconsin depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Wisconsin
County:Rock
City:Janesville

Project Type

Building Category:Water and Sewage Piping, Electrical Work, Excavating & Grading
Work Type:New

Project Description:

Water Piping, Electrical Work, Excavating & Grading, Sitework Strip and stockpile 50,000 C.Y. topsoil; excavate 230,000 C.Y. unclassified material to shape gradient control layer and sideslopes; 95,000 C.Y. in-place 4-foot Clay liner on base of site and 3H:1V sideslope; 4,800 L.F. 6" gradient control piping; 3,000 L.F. 4" and 6" leachate and headwell piping; 600 L.F. 1" and 3" cased forcemain pipe; 930,000 S.F. geotextile; 660,000 S.F. smooth and textured geomembrane; placement of 25,000 C.Y. drainage layer stone over the geomembrane liner; 3,300 L.F. 4", 10", 12" and 14" gas transfer pipe, sedimentation basin, surface water control pipe, structures, and ditches; 4,000 L.F. electric conduit and air line; 6 manholes; 3 gas valves, 10,000 L.F. power cable and control wiring; electric control panel; leachate pump; gas condensate pump; 50,000 S.Y. seeding; 2,700 S.Y. erosion mat; 7,000 L.F. silt fence; construct 5 gas probes; abandon 3 groundwater wells; 3,500 C.Y of limestone; an incidentals