Excavating & Grading Project Case Study in Ohio

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of excavating & grading projects in Ohio are also available.

Project Overview

Project Title:OHDOT SR 161 ROAD CONSTRUCTION
Start Date:2004-04-01
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build bridges & culverts in Ohio depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Ohio
County:Holmes
City:Walnut Creek
Address:SR 161/Various

Project Type

Building Category:Bridges & Culverts, Excavating & Grading
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Excavating & Grading This project consists of 2 parts. The first part being the construction of a Collector-Distributor System (1.1 kilometers westbound and 1.0 kilometers eastbound) adjacent to State Route 161 from a point 0.6 kilometers east of Interstate 270 to Big Walnut Creek. The project also includes the reconstructio of the State Route 161/Sunbury Road Interchange to provide access to both the Collector-Distributor System and State Route 161. Additionally, there will be the widening of Sunbury Road through the Interchange area, the replacement of the Sunbury Road Bridge over State Route 161 and the widening of the existing State Route 161 Bridge over Big Walnut Creek. The second part consists of addin two lanes in each direction to Interstate 270, reconstruction of State Route 16 and directional ramps. The work includes the construction of nine bridges. The length of this project is 2.301 kilometers with an additional length of 1.718 kilometers of work along State Route 161. All interested parties are encouraged to attend this pre-bid meeting.