Total value of New York construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$123,817,090,743
Bid Phase:$2,103,563,231
Post-Bid:$150,666,811,514
Civil Projects (value)
Pre-Bid Phase:$19,233,332,761
Bid Phase:$303,991,749
Post-Bid:$48,364,568,636



Excavating & Grading Project Case Study in New York

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of excavating & grading projects in New York are also available.

Project Overview

Project Title:BNIA WETLAND SYSTEM
Estimated Value:$10,467,700
The cost to build excavating & grading in New York depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:New York
County:Erie
Address:4200 Genesee St

Project Type

Building Category:Excavating & Grading
Work Type:New

Project Description:

Water Piping, Excavating & Grading, Sewage Piping The NFTA Is Seeking Bids On The Construction Of An Engineered Wetland System Near The Southwest Corner Of The Buffalo Niagara International Airport (BNIA) T Treat Glycol-Contaminated Stormwater Runoff. The Main Part Of The Engineered Wetland System Will Be Four Large, Aggregate Filled Wetland Basins (Cells). Thi Project Also Involves Constructing; Various Belowground Structures, Yard Connecting Piping & Electrical, Modifications To Existing Stormwater & Rich Glycol (Concentrate) Collection Facilities And A Utility Building Complete With Air Blowers, Electrical Equipment & Chemical Dosing Equipment. The Majority Of The Construction Will Be Within The BNIA's Secured Airfield.