Excavating & Grading Project Case Study in Kentucky

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of excavating & grading projects in Kentucky are also available.

Project Overview

Project Title:KYDOT US 23 LEFT TURN LANE CONSTRUCTION
Start Date:2004-10-01
Estimated Value:$159,238
The cost to build water and sewage piping in Kentucky depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Kentucky
County:Boyd
Address:US 23/Various

Project Type

Building Category:Water and Sewage Piping, Excavating & Grading
Work Type:New

Project Description:

Road[s], Excavating & Grading, Sewage Piping US 23 AT 55TH STREET CONSTRUCT LEFT TURN LANE AT INTERSECTION OF US 23 (MP 14.9 AND 55TH STREET (MP 15.1), A DISTANCE OF 0.14 MILES. ASPHALT SURFACE WITH GRADE & DRAIN.