Excavating & Grading Project Case Study in Illinois

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of excavating & grading projects in Illinois are also available.

Project Overview

Project Title:ILDOT BIKE PATH CONSTRUCTION
Start Date:2004-04-01
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build bridges & culverts in Illinois depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Illinois
County:Madison
City:Edwardsville
Address:IL Rte 162 To Bluff Junction

Project Type

Building Category:Bridges & Culverts, Excavating & Grading
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Excavating & Grading 6.9 miles of bike path construction along with all necessary collateral work,from Illinois Route 162 to Bluff Junction in Edwardsville;includes 1,834 c yds furnished excavation;5,859 lbs fertilizer nutrients;527 tons stone dumped riprap;48,743 sq yds aggregate base course;1,061 sq yds bituminous concrete shoulder removal;2,226 sq yds aggregate shoulders;1,160 lbs furnishing and erecting structural steel;3,400 lbs reinforcement bars,epoxy coated;1,732 ft pipe culverts;25 precast reinforced concrete flared end sections;24 steel end sections;26 manholes;19,166 ft epoxy pavement marking;4,661 tons bituminous concrete surface course;306 tons bituminous concrete binder course;6,577 sq yds bituminous concrete pavement;6,165 ft ditch cleaning;traffic control and protection.