CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Nevada construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$5,656,352,418
Bid Phase:$14,125,000
Post-Bid:$35,571,957,157
Civil Projects (value)
Pre-Bid Phase:$1,728,563,401
Bid Phase:$8,939,750
Post-Bid:$8,452,091,101



Entertainment Complex Project Case Study in Nevada

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of entertainment complex projects in Nevada are also available.

Project Overview

Project Title:SOUTHCOAST CASINO
Start Date:2004-09-01
Estimated Value:$120,000,000
The cost to build casinos in Nevada depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Nevada
County:Clark
City:Las Vegas
Address:Las Vegas Blvd & Silverado Ranch

Project Type

Building Category:Casinos, Entertainment Complex
Work Type:New

Project Description:

Casino Dining, Gaming, Kitchen, Lobby, Lounge, Restroom Concrete Foundation, Cast In Place Concrete Structural Frame, EIFS Exterior , Steel Joist Roof Structure, Metal Roof Deck, Clay Tile Roof, Single Ply Roof, Membrane Roofing, Air Handling System Landscaping, Irrigation System, Post Tension Concrete Structural Frame, Aluminu Windows, Aluminum Storefront Windows & Entry Door System, Ceramic Tile, Quarry Tile, Terrazo Tile, Granite & Marble Finishes, 3 Passenger Elevators, 1 Freight Elevator, 9 Service Elevators, 4 Esculators, 2 Dumbwaiters, Fire Sprinklers, Fire Alarms, Mezzanine Mechanical Units