Elementary School Project Case Study in South Carolina

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of elementary school projects in South Carolina are also available.

Project Overview

Project Title:Mount Pleasant Academy
Start Date:2007-08-01
Estimated Value:$14,400,000
The cost to build elementary schools in South Carolina depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:South Carolina
County:Charleston
City:Mount Pleasant
Address:605 Center St

Project Type

Building Category:Elementary Schools
Work Type:New

Project Description:

The original Mount Pleasant Academy was demolished and replaced with a new 65,000 square foot school which included 26 general classrooms, 5 special ed classrooms, 2 computer labs, art room, band and music labs, and a 3,000 square foot multi-purpose room joined to the cafeteria with an operable partition which will allow opening into one large space or dividing in to two separate spaces. The multi-purpose room also has a platform stage. Construction of the new school presented numerous challenges for the district and the design team. One challenge was that the site is located in a flood zone, thus requiring the new facility's first floor elevation to be raised above flood level to be in accordance with code. Another challenge was that this facility is located in a residential neighborhood and the design team was challenged to design a facility that blended in with the neighborhood. The biggest challenge for this project was due to the site being very narrow and long, which presented issues like providing adequate car and bus stacking and required parking spaces. However, through collaboration with the Town of Mt. Pleasant, these issues were overcome, allowing the facility to be replaced. The Town of Mt. Pleasant and Charleston County School District entered into a joint use agreement of the parking lot located in front of the baseball field, to be used by the school as well as the Town. Secondly, through cooperation with the Town and CCSD, an easement variance was obtained which allows proper bus and car stacking and turnaround space. Without this collaboration with the Town, it was unlikely this facility could have been replaced. The architectural team had a very challenging job to re-develop this existing site to accommodate the new facility and has done a very good job of not only re-developing this site but blending the design of this facility into a residential neighborhood where it is located.

Green & Sustainable Features:

The new facility was designed and constructed under the U.S. Green Building Council LEED program initiatives. However, CCSD did not seek certification due to the costs associated with certification.