Electrical Work Project Case Study in Montana

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of electrical work projects in Montana are also available.

Project Overview

Project Title:MTDOT MOSBY REST AREA CONST
Start Date:2004-06-01
Estimated Value:$1,000,000
The cost to build electrical work in Montana depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Montana
County:Garfield
Address:Musselshell River On MT 200/Various

Project Type

Building Category:Electrical Work, Parks & Landscaping
Work Type:New

Project Description:

Park[s], Landscaping, Road[s], Electrical Work 20,000.000 UNIT MISCELLANEOUS WORK 1.000 L SUM CONSTRUCTION SURVEY AND LAYOUT 1.000 L SUM TWO PERSON SURVEY CREW-40 HRS 1.000 L SUM 3 PERSON SURVEY CREW-40 HRS 1.000 L SUM FOUR PERSON SURVEY CREW-40 HRS 1.000 L SUM MOBILIZATION 1,232.300 M2 REMOVE BITUMINOUS PAVEMENT 20,923.000 M3 EXCAVATION-UNCLASSIFIED 27.300 M3 BEDDING MATERIAL 15,000.000 UNIT TEMPORARY EROSION CONTROL 6,850.200 M3 CRUSHED AGGREGATE COURSE 132.700 MT COVER MATERIAL GRADE 4A 3,007.800 MT PLANT MIX GR D-COMMERCIAL 17.400 MT EMULSIFIED ASPHALT CRS-2P 6,259.000 M2 COLD MILLING 2.700 M3 CONCRETE AC-DC 8.500 M3 CONCRETE-CLASS D 24.200 M REMOVE PIPE CULVERTS 9.500 M RCP 900 MM CL 2 31.500 M RCP IRR 450 MM CL 3 16.500 M CAP 600 MM X 1.91 MM 15.000 M CAP 750 MM X 1.91 MM 1.000 EACH COMB 1200 MM T3 MH-T2 CUR INL 20.000 M FENCE-CHAIN LINK 3.000 M GATE-CHAIN LINK 805.300 M FARM FENCE-TYPE F4W 3.000 EACH FARM FENCE-PANEL/SINGLE FW 10.000 EACH FARM FENCE-PANEL/DOUBLE F 1.000 EACH PIPE GATE 362.600 M REMOVE FENCE 828.300 M FENCE PREPARATION 592.200 M2 SIDEWALK-CONCRETE 100 MM 14.900 M2 SIDEWALK-PATTERNED CONC 100 MM 762.000 M CURB&GUTTER-CONCRETE 3,581.000 M3 TOPSOIL 3.300 HA SEEDING AREA NO 1 0.300 HA SEEDING AREA NO 2 3.300 HA FERTILIZING AREA NO 1 0.300 HA FERTILIZING AREA NO 2 3.300 HA CONDITION SEEDBED SURFACE 3,000.000 M2 EROSION CONTROL BLANKET 1.000 L SUM IRRIGATION SYSTEM 2.700 M3 RIPRAP-CLASS 1 RANDOM 4.800 M3 FOUNDATION-CONCRETE 117.000 M CONDUIT-STEEL 27 MM RIGID 384.000 M CONDUIT-PLASTIC 27 MM 192.000 M CONDUIT-PLASTIC 53 MM 20.000 M CONDUIT-PLASTIC 78 MM 4.000 EACH PULL BOX-CONCRETE TYPE 1 1.000 EACH PULL BOX-CONCRETE TYPE 2 470.000 M CONDUCTOR-COPPER AWG8-600V 1,464.000 M CONDUCTOR-COPPER AWG10-600V 60.000 M CND-COPPER AWG 500 KCMIL-600V 10.000 EACH STANDARD-STL TYPE 10-A-500-2 2.000 EACH STANDARD-STL TYPE 10-A-500-4 2.000 EACH PHOTO ELECTRIC CONTROL 12.00 EACH LUMINAIRE ASSEMBLY-250W SV 1.000 EACH SERV ASSEMBLY-30 AMP 1.000 EACH SERV ASSEMBLY-400 AMP 1.000 L SUM TRAFFIC CONTROL 280.000 KL WATER FOR DUST CONTROL 7.800 M2 SIGNS-ALUM SHEET INCR-SHT III 10.900 M2 SIGNS-SHEET ALUM REFL SHT III 312.000 KG POSTS-STEEL STRUCTURAL SIGN 126.000 KG POSTS-TUBULAR STEEL-SQ-PERF 28.900 M POLES-TRD TMBR-BARN 100 MM 2.000 EACH FRANG SIGN POST BKWY S75X8 2.000 EACH FRANG SIGN POST BKWY S100X11 2.000 EACH DELINEATOR-DES D 1.000 EACH HISTORIC MARKER 4.000 EACH REMOVE SIGNS 1.000 EACH REMOVE HISTORIC MARKER 1.000 EACH RESET SIGNS 2.100 KM STRIPING-WHITE EPOXY SOLID 1.300 KM STRIPING-YELLOW EPOXY SOLID 53.000 L STRIPING-WHITE PAINT 75.000 L STRIPING-YELLOW PAINT 80.000 L WORDS&SYMBOLS-WHITE PAINT 21.000 L WORDS&SYMBOLS-YELLOW PAINT 103.000 L CURB MARKING-YELLOW 127.000 L WORDS/SYMBOLS-WHITE EPOXY 32.000 L WORDS/SYMBOLS-YELLO EPOXY 1.000 EACH PROPANE TANK-3785 L 1.000 L SUM REST AREA BUILDING 2.000 EACH PICNIC SHELTER 1.000 L SUM WATER SYSTEM 1.000 L SUM SANITARY SEWER SYSTEM 8.000 EACH PICNIC TABLE 4.000 EACH BENCH 2.000 L SUM FLAGPOLE 12.000 EACH TRASH RECEPTACLE 1.000 L SUM LANDSCAPING