Demolition Project Case Study in Michigan

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of demolition projects in Michigan are also available.

Project Overview

Project Title:MICHIGAN DEMOLITION ABESTOS & EXCAVATION
Estimated Value:$248,610
The cost to build demolition in Michigan depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Michigan
County:Wayne
City:Highland Park
Address:369 Glendale St

Project Type

Building Category:Demolition
Work Type:Alteration

Project Description:

Demolition Demolition,UST Removal, Asbestos And Lead Abatement And Remedial Excavation, AC Abatement, Characterization And Disposal, Free Product Removal, Characterization, And Disposal Of Liquid And Sludge Materials, Removal And Disposal Of Debris And Equipment Located Inside The Boiler Building, Including, But Not Limited To The Removal And Disposal Of Up To Two 20,000 Gallon Boiler Tanks, 1-5,000 Gallon Tank And 7-100 Gallon Tanks, UST Decommissioning Of Up To (2) 20,000 Gallon USTs, Remove Underground Concrete Vault And All Equipment/Debris Contained Within And Assume Concrete Vault Is 20 Feet By 20 Feet By 8 Feet And 6 Inches Is Thickness, Demolition Of Boiler Building And All Associated Structures, Building Removal Shall Include Removal Of Concrete Footings And All Associated Piping/Structures to 5 Feet Below Grade, Abandonmen Of Approximately 460 Feet Of Steam Tunnel Spanned In Four Separate Runs, Excavation And Disposal Of Impacted Site Soils, Backfill And Compaction Of The Basement And Tunnel Areas And All Underground Anomalies, Approximately 11,000 Tons, Construction/Deconstruction Of On Site Decontamination Pad And Site Restoration