Dam Project Case Study in Colorado

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of dam projects in Colorado are also available.

Project Overview

Project Title:ARAPAHO NATL WILDLIFE REFUGE DAM
Estimated Value:$250,000
The cost to build dams in Colorado depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Colorado
County:Jackson
City:Walden
Address:Arapaho National Wildlife Refuge

Project Type

Building Category:Dams
Work Type:New

Project Description:

Dams Construct Modifications To The Muskrat Dam, An Earthen Embankment Dam Located O The Arapaho National Wildlife Refuge In Jackson County, Colorado, 953 JC Road #32 Walden, CO 80480. Installing, Maintaining & Removing Temporary Erosion Control Measures & Construction Fencing. Installing, Operating & Removing Dewaterning Systems. Furnishing & Installing A New To Drain System To Direct Seepage To Potter Creek. Constructing A Toe Berm Along The Downstream Slope. Modifying (Regrading) The Dam Embankment To A Constant Crest Elevation Sloped Upstream. Installing A New Cut Off Wall Within Emergency Spillway Channel. Eroded Areas In The Emergency Spillway Channel. Regrading The Right Service Spillway/Outlet Works Channel Bank, & Installing & Furninshing Riprap & Riprap Bedding In The Regradrd Area. Modifying Existing Piezometers To Match The New Dam Geometry. Installing Staff Gauges. Removing Vegetation From The Upstream Slope, Filling Animal Burrows, & Placing Riprap On The Upstream Slope In Areas sparse coverage. Reclaiming disturbed areas. Other items of work incidental to the above work items including clearing, stripping and stockpiling cover soil, unclassified excavation, reservoir control, and access road maintenance.