Community Center Project Case Study in Vermont

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of community center projects in Vermont are also available.

Project Overview

Project Title:SOUTHERN VERMONT RECREATION CENTER
Estimated Value:$2,500,000
The cost to build community centers in Vermont depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Vermont
County:Caledonia
City:Springfield
Address:Clinton & Bridge Sts (Route 11)

Project Type

Building Category:Community Centers, Recreation Centers
Work Type:New

Project Description:

Community Center Pool Pavilion, Locker Room, Bathrooms, Lobby/Galleria Work includes: Site work, Concrete, Architectural concrete, colored concrete pool deck, Slab on deck, masonry, Structural Steel, joist and deck, Misc. metals, Cold formed metal, expansion joints, glue laminated construction, Decking, Rough Carpentry, Architectural woodwork, Waterproofing, Spray urethane Building insulation, Manufactured metal panel siding, Membrane roofing and accessories, Fire stopping, Joint sealing, Steel doors and frames, Access doors Aluminum entrances and storefronts, Aluminum windows, Hardware, Glazing, aluminum curtain wall, Fiberglass sandwich panels, Gypsum drywall, Ceramic tile ACT Resilient stair accessories, Sports floor, Carpet, Painting, Toilet compartments, Louvers, Metal and Wood lockers, Fire ext., Toilet accessories, Residential appliances, Floor mats, Blinds, Swimming pools and Equipment, Security and fire alarm, Hydraulic elevator, Plumbing, HVAC, Electrical, Voice and data. The project is scheduled to start the first week of October