CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Georgia construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$19,412,522,069
Bid Phase:$235,797,314
Post-Bid:$84,030,695,754
Civil Projects (value)
Pre-Bid Phase:$3,270,152,816
Bid Phase:$82,171,638
Post-Bid:$20,673,734,521



Club Project Case Study in Georgia

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of club projects in Georgia are also available.

Project Overview

Project Title:ENCLAVES CLUBHOUSE AT BERWICK PLANTATION
Estimated Value:$1,097,160
The cost to build clubs in Georgia depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Georgia
County:Chatham
City:Savannah
Address:I-95 & I-16 at Berwick Blvd

Project Type

Building Category:Clubs
Work Type:New

Project Description:

Club House Activity, Athletic Courts, Balcony , Break Room, Closet, Computer, Concession, Courtyard, Customer Service, Dining, Dressing/Changing, Food Storage, Foyer, Gathering, Kitchen, Lounge, Multi Purpose Room, Office[s], Reading, Recreation, Restroom, Storage Cast In Place Concrete Foundation, Structural Steel Frame, Brick Veneer Exterior, Masonry Exterior , Rigid Insulation Roof Structure, Wood Joist Roof Structure, Metal Roof Deck, Composition Shingle Roof, Chilled Water Cooling System, Design Build Electrical System, Design Build Fire Sprinkler System, Design Build HVAC System, Design Build Mechanical System, Design Build Plumbing System