CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Nevada construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$5,656,352,418
Bid Phase:$14,125,000
Post-Bid:$35,571,957,157
Civil Projects (value)
Pre-Bid Phase:$1,728,563,401
Bid Phase:$8,939,750
Post-Bid:$8,452,091,101



Church Project Case Study in Nevada

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of church projects in Nevada are also available.

Project Overview

Project Title:CHURCHILL CO WATER DIST/WW COLLECTION
Estimated Value:$5,118,110
The cost to build churches in Nevada depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Nevada
County:Churchill
City:Fallon

Project Type

Building Category:Churches, Municipal Water and Wastewater Facilities, Water and Sewage Piping
Work Type:New

Project Description:

Water Piping, Sewage Piping, Sewage Treatment Wastewater Collection System - Install Approx 6,474 LF Of 4" & 6" HDPE DR 21 Sewer Force Mains, 3,930 LF Of 10" & 12" PVC SDR 26 Sewer Gravity Main, New Duplex Submersible Lift Station, Tranching, Jack And Bore, Drilling Dewatering, Manholes, Backfill, Compaction, Asphalt Concrete Patch Paving, 360 LF Of Directional Drilling Under The Creek, 460 LF Of Jack And Bore Drilling With A 24" Steel Casing Under Hwy 50, Carson River And RR Track Lift Station - 6" Forecemain, 2 Submersible Pumps, Piping, Valving, Wetwell, Valve Vaults, Motor Control CenterControls, Remote Telemetry And SCADA, Standby Diesel Generator, Fencing Water System - Install Approx 3,450 LF Of 8", 1,950 LF Of 10" And 11,525 LF Of 12" PVC C900 Class 150 Water Main, Trenching, Dewatering, Shoring, Bedding, Backfilling, Compaction, Pavement Cutting, Asphalt Patching, Testing, Disinfection, 360 LF Of Pipeline Directional Drilling Under The TCID Ditch, 450 LF Of Jack And Bore With 24" OD Steel Casing Under Hwy 50, Carson River And RR Tracks