CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Florida construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$36,375,097,990
Bid Phase:$316,397,081
Post-Bid:$118,560,382,662
Civil Projects (value)
Pre-Bid Phase:$11,003,009,214
Bid Phase:$580,697,704
Post-Bid:$44,663,676,855



Church Project Case Study in Florida

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of church projects in Florida are also available.

Project Overview

Project Title:FIRST BAPTIST CENTRAL FL CLASSROOM BLDG
Estimated Value:$3,000,000
The cost to build churches in Florida depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Florida
County:Orange
City:Ocoee
Address:8500 W Colonial Dr

Project Type

Building Category:Churches, Religious Classrooms
Work Type:New

Project Description:

Religious Classroom[s], Church Classrooms, Office[s], Restroom, Vehicle Parking Concrete Slab On Grade Foundation, CMU Block Structural Frame, Structural Steel Frame, EIFS Exterior , Metal Deck Roof Structure, Steel Joist Roof Structure, Metal Roof Deck, Steel Bar Joist Roof Deck , Modified Bitumen Roof, Single Ply Roof, Membrane Roofing Two-Story CMU & Structural Steel Classroom Building To Be Constructed On Existing Educational Campus