Canal Project Case Study in Utah

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of canal projects in Utah are also available.

Project Overview

Project Title:POINT OF THE MOUNTAIN AQUEDUCT
Estimated Value:$60,621,000
The cost to build canals in Utah depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Utah
County:Salt Lake
City:Sandy
Address:Point Of The Mountain

Project Type

Building Category:Canals
Work Type:New

Project Description:

Water Piping Work Includes Construction Of 62,800 Feet Of 60 Inch Pressure Pipe, 3,300 Feet Of 48 Inch Pressure Pipe, 13,500 Feet Of 84 Inch Pressure Pope, 8,800 Feet Of 3 To 16 Inch Water Distribution Piping, Turnouts, Valve Stations, Drainage Piping Provo Canal Intake Structure, Jordan Aqueduct Connection, 64,000 Feet Of Fiber Optic Cable, I-15 Tunneled Crossing, A 138kV & 12kV Buried Underground duct And Conductors.