CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Alabama construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$6,995,400,266
Bid Phase:$157,488,500
Post-Bid:$29,153,690,270
Civil Projects (value)
Pre-Bid Phase:$1,978,062,339
Bid Phase:$73,287,665
Post-Bid:$9,142,107,127



Cafeteria Project Case Study in Alabama

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of cafeteria projects in Alabama are also available.

Project Overview

Project Title:ALBERTVILLE HIGH SCHOOL CAFETERIA
Estimated Value:$3,779,840
The cost to build cafeterias in Alabama depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Alabama
County:Marshall
City:Albertville
Address:402 E McCord Ave

Project Type

Building Category:Cafeterias
Work Type:New

Project Description:

Cafeteria Cold Storage, Dining, Food Preparation, Food Storage, Kitchen Concrete Foundation, CMU Block Structural Frame, Structural Steel Frame, Brick Exterior, Concrete Block Exterior, Steel Joist Roof Structure, Modified Bitumen Roof