Bridge & Culvert Project Case Study in Washington

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Washington are also available.

Project Overview

Project Title:MT BAKER SNOQUALMIE ICE CAVES TRL BRIDGE
Start Date:2008-09-01
Estimated Value:$97,300
The cost to build bridges & culverts in Washington depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Washington
County:Snohomish
Address:Darrington Ranger Dist

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s] ICE CAVES TRAIL BRIDGE INSTALLATION, This Project Consists Of The Reconstruction Of A 187 Ft Long, And 6 Ft Wide Trail Bridge That Was Partially Destroyed In The November 2006 Flood. The Preliminary Plans Are To Replace Both The Destroyed Glu-Lam Girders & The Remaining Glu-Lam Girders With Aluminum Trusses Supported By The Remaining Three Piers, One Old Abutment And One New Abutment, The New Structure Will Be Somewhat Longer (About 210 Ft. Total). This Contract Will Include The Installation Of A Government Furnished Aluminum Superstructure, As Well As New Bents/Abutments Of Steel And/Or Timber, Work Includes, But Is Not Limited To, Removal Of Old Timber And Hardware; Aluminum, Steel &/Or Timber Assembly.