Bridge & Culvert Project Case Study in Washington

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Washington are also available.

Project Overview

Project Title:GIFFORD PINCHOT NATIONAL FOREST BRIDGE
Estimated Value:$366,227
The cost to build bridges & culverts in Washington depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Washington
County:Clark
City:Vancouver
Address:10600 NE 51st Circle

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s] Woods Creek Bridge, Construction Project To Perform Bridge Construction Work On Forest Service Road No. 25. The Work Includes: Traffic Management; Excavation & Removal Of 3 Adjacent Metal Pipe Culverts From The Forest; Construction Survey Staking; Driving Of Pile Foundations; Stringent Dewatering, Erosion & Sediment Control Measures; Construction Of One Pre-Cast Pre-Stressed Concrete Bridge; Production & Placement Of Riprap; Seeding & Mulching Of Disturbed Areas; Reestablishing The Roadway To The Existing Alignment; & Replacement Of The Existing Aggregate Base & Asphalt Concrete Surface, The Project Can Be Accessed By Taking Interstate 5 To The US-12 East Exit, Proceeding Approximately 50 Mile To The Town Of Randle, & Turning South On SR 131 Which Becomes Forest Road 25, Project Site Is Located At Approximately Mile Point 6.7 On Forest Road 25