Bridge & Culvert Project Case Study in Oregon

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Oregon are also available.

Project Overview

Project Title:SKULL CANYON & STONEY CREEK BRIDGES
Estimated Value:$376,626
The cost to build bridges & culverts in Oregon depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Oregon
County:Grant
Address:NF John Day River Rd

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s] Constructing A New Glued Laminated Deck System For Skull Canyon Bridge & Replacing The Existing Bridge At Stoney Creek With A Pre-Stressed Concrete Bridge, Work For The Skull Canyon Bridge Includes Demolition Of Existing Deck & Curbs For Entire Bridge Length, Disposal Of Debris, Construction Of A New Deck With Glued Laminated Panels, Replacing Bulkhead, Installing New Wheel Guards & Rail System, Placing Riprap Under The Bridge, Modifying The Existing Concrete Wingwalls, Designing, Providing, & Constructing A Prefabricated Modular Retaining Wall System; Paving Asphalt Approaches; Temporary & Permanent Signing & All Associated Site Work. Work For The Stoney Creek Bridge Includes Demolitio Of The Existing Bridge Superstructure & Substructure Constructing New Concrete Abutment Footings; Designing, Providing & Installing A Contractor-Engineered Pre-Stressed Concrete Slab Bridge; Bridge Railing; Constructing & Removing A Temporary By-Pass Road; Riprap; Asphalt Approaches; Traffic Control; Permanent Signing & All Associated Site Work, These Bridges Are Located In Grant County, West Of US Highway 395 On The NF John Day River Road Near Dale, Oregon In T7S., R29E., Sections 2 & 10, W.M.