Bridge & Culvert Project Case Study in Oregon

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Oregon are also available.

Project Overview

Project Title:HARNEY CO THREE BRIDGES
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build bridges & culverts in Oregon depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Oregon
County:Harney
City:Burns

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Demolition Involves Construction Of Dry Creek (Catlow Valley Road) Bridge, Silver Creek Slough (Silver Creek Road) Bridge, & Ninemile Slough (South Harney Road) Bridge Includes Construction Of Three New Precast Prestressed Concrete Voided Slab Bridges. Also Includes Construction & Removal Of Three Temporary Detour Roads; Removal Of Three Existing Bridges; Installation Of 1,670 Feet Of Driven PP12.75x0.375 Steel Piles; Approximately 140 CY Of Structural Concrete; 990 Fee Of Precast Prestressed Concrete Voided Slabs; 810 Feet Of Guardrail; 325 Feet O Three Beam Side-Mount Steel Bridge Rail; 2,500 Tons Of Aggregate Base; 850 Tons Of Asphalt Concrete.