Bridge & Culvert Project Case Study in Montana

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Montana are also available.

Project Overview

Project Title:COTTONWOOD CREEK BRIDGE REPLACEMENT
Estimated Value:$302,216
The cost to build bridges & culverts in Montana depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Montana
County:Fergus
Address:Lower Cottonwood Creek Rd

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s] The construction of a new 105-ft X28-ft bridge on Lower Cottonwood Creek Road over Cottonwood Creek, west of Lewistown, MT. Improvements consist of, but are not limited to, removal and disposal of existing bridge, substructure construction, superstructure construction, bridge railings, placing select backfill, and hauling and placing riprap. The superstructure of the new bridge will consist of precast, prestressed concrete bulb-tee beams and T101 metal guardrail. The beams will be founded on a new stub abutment substructure. The stub abutment foundation consists of a cast-inplace concrete cap, backwall and wingwalls supported by driven steel piles.