Bridge & Culvert Project Case Study in Georgia

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Georgia are also available.

Project Overview

Project Title:GADOT SR 11 BRIDGE CALL NO 003
Estimated Value:$2,420,700
The cost to build bridges & culverts in Georgia depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Georgia
County:Barrow
City:Auburn
Address:SR 11

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s] 0.559 MILE OF CONSTRUCTION OF A BRIDGE AND APPROACHES ON SR 11(WINDER-MONROE HWY)OVER SCOTT CREEK. LUMP LUMP TRAFFIC CONTROL-BRST0-0052-01(014)01 1.000 EA FIELD ENGINEERS OFFICE TP 3 1,000.000 HR TRAINING HOURS 8.000 AC TEMPORARY GRASSING 110.000 TN MULCH 2.000 EA CONSTRUCTION EXIT 1.000 EA CONSTRUCT AND REMOVE SILT CONTROL GATE,TP 3 97.000 EA CONSTRUCT AND REMOVE TEMPORARY DITCH CHECKS-STONE PLAIN RIP RAP/SAND BAGS 460.000 LF CONSTRUCT AND REMOVE BALED STRA EROSION CHECK 1.000 EA CONSTRUCT AND REMOVE INLET SEDIMENT TRAP 1,000.000 LF MAINTENANCE OF TEMPORARY SILT FENCE,TP A 1,800.000 LF MAINTENANCE OF TEMPORARY SILT FENCE,TP C 97.000 EA MAINTENANCE OF EROSION CONTROL CHECKDAMS/DITCH CHECKS 230.000 LF MAINTENANCE OF BALED STRAW EROSION CHECK 1.000 EA MAINTENANCE OF SIL CONTROL GATE,TP 3 8.000 EA MAINTENANCE OF CONSTRUCTION EXIT 1.000 EA MAINTENANC OF INLET SEDIMENT TRAP 2.000 EA WATER QUALITY MONITORING AND SAMPLING 15.000 MO WATER QUALITY INSPECTIONS 2,000.000 LF TEMPORARY SILT FENCE,TYPE A 3,500.000 LF TEMPORARY SILT FENCE,TYPE C 2,000.000 CY ROCK EMBANKMENT LUMP LUMP GRADING COMPLETE-BRST0-0052-01(014)01 210.000 CY GRANULAR EMBANKMENT,INCL MATL&HAUL 9,100.000 TN GR AGGR BASE CRS,INCL MATL 440.000 TN AGGR SURF CRS 1,400.000 TN RECYCLED ASPH CONC LEVELING,INCL BITUM MATL&H LIME 5,700.000 TN RECYCLED ASPH CONC 25 MM SUPERPAVE,GP 1 OR 2,INCL BITUM MATL&H LIME 1,500.000 TN RECYCLED ASP CONC 12.5 MM SUPERPAVE,GP 2 ONLY,INCL BITUM MATL&H LIME 1,500.000 TN RECYCLED ASPH CONC 19 MM SUPERPAVE,GP 1 OR 2,INCL BITUM MATL&H LIME 1,500.000 GL BITUM TACK COAT 150.000 SY MILL ASPH CONC PVMT,VARIABLE DEPTH