CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Georgia construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$19,412,522,069
Bid Phase:$235,797,314
Post-Bid:$84,030,695,754
Civil Projects (value)
Pre-Bid Phase:$3,270,152,816
Bid Phase:$82,171,638
Post-Bid:$20,673,734,521



Bridge & Culvert Project Case Study in Georgia

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Georgia are also available.

Project Overview

Project Title:GADOT SR 153 BRIDGE WORK CALL NO 23
Estimated Value:$1,871,950
The cost to build bridges & culverts in Georgia depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Georgia
County:Schley
City:Ellaville
Address:SR 153 Over Little Muckalee Creek

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s] LUMP LUMP TRAFFIC CONTROL - BRST-1169(6) 01 2.000 EA TRAFFIC CONTROL, PORTABLE IMPACT ATTENUATOR 1,000.000 HR TRAINING HOURS 2.000 AC TEMPORARY GRASSING 51.00 TN MULCH 4.000 EA CONSTRUCTION EXIT 4.000 EA CONSTRUCT AND REMOVE SILT CONTROL GATE, TP 3 650.000 LF CONSTRUCT AND REMOVE TEMPORARY PIPE SLOPE DRAIN 26.000 EA CONSTRUCT AND REMOVE TEMPORARY DITCH CHECKS 5,000.000 LF CONSTRUCT AND REMOVE BALED STRAW EROSION CHECK 500.000 LF MAINTENANCE OF TEMPORARY SILT FENCE, TP A 1,760.000 LF MAINTENANCE OF TEMPORARY SILT FENCE, TP C 26.000 EA MAINTENANCE OF EROSION CONTROL CHECKDAMS/DITCH CHECKS 2,500.000 LF MAINTENANCE OF BALED STRAW EROSION CHECK 4.000 EA MAINTENANCE OF SILT CONTROL GATE, TP 3 4.000 EA MAINTENANCE OF CONSTRUCTION EXIT 2.000 EA WATER QUALITY MONITORING AND SAMPLING 12.000 MO WATER QUALITY INSPECTIONS 1,000.000 LF TEMPORARY SILT FENCE, TYPE A 3,520.000 LF TEMPORARY SILT FENCE, TYPE C LUMP LUMP GRADING COMPLETE - BRST-1169(6) 01 2,514.000 TN GR AGGR BASE CRS, INCL MATL 100.000 TN AGGR SURF CRS 570.000 TN RECYCLED ASPH CONC LEVELING, INCL BITUM MATL & H LIME 575.000 TN RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H LIME 880.000 TN RECYCLED ASPH CONC 9.5 MM SUPERPAVE, BLEND 1, INCL BITUM MATL & H LIME 725.000 TN RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2,INCL BITUM MATL & H LIME 1,077.000 GL BITUM TACK COAT 267.000 SY REINF CONC APPROACH SLAB, INCL SLOPED EDGE 910.000 LF ASPHALTIC CONCRETE CURB - 5 IN 55.000 SY CONC SLOPE DRAI 2.000 EA CONC SPILLWAY, TP 3 2.000 EA CONC SPILLWAY, TP 4 100.000 LF HIGH STRENGTH PVMT REINF FABRIC, 18 IN WIDTH 568.000 LF STORM DRAIN PIPE, 24 IN, H 1-10 28.000 LF STORM DRAIN PIPE, 36 IN, H 1-10 80.000 LF SIDE DRAIN PIPE, 18 IN H 1-10 1.000 EA SAFETY END SECTION 24 IN, STORM DRAIN, 6:1 SLOPE 2.000 EA SAFET END SECTION 18 IN, SIDE DRAIN, 6:1 SLOPE 2.000 EA FLARED END SECTION 18 IN, SID DRAIN 1.000 EA FLARED END SECTION 24 IN, STORM DRAIN 2.000 EA FLARED END SECTIO 36 IN, STORM DRAIN 500.000 LF UNDDR PIPE INCL DRAINAGE AGGR, 6 IN 185.000 SY ST DUMPED RIP RAP, TP 3, 12 IN 185.000 SY PLASTIC FILTER FABRIC 1,912.000 LF TEMPORARY BARRIER, METHOD NO. 1 10.000 EA RIGHT OF WAY MARKERS 38.000 SF HIGHWA SIGNS, TP 1 MATL, REFL SHEETING, TP 9 80.000 LF GALV STEEL POSTS, TP 7 83.000 L GUARDRAIL, TP T 1,150.000 LF GUARDRAIL, TP W 2.000 EA GUARDRAIL ANCHORAGE, TP 1 2.000 EA GUARDRAIL ANCHORAGE, TP 12 3,920.000 LF SOLID TRAFFIC STRIPE, 5 IN, WHITE 1,960.000 GLF SKIP TRAFFIC STRIPE, 5 IN, YELLOW 53.000 EA RAISED PVMT MARKERS TP 1 320.000 LF PREFORMED PLASTIC SOLID PVMT MKG, 8 IN, CONTRAST (BLACK-WHITE), TP PB 160.000 GLF PREFORMED PLASTIC SKIP PVMT MKG, 8 IN, CONTRAS (BLACK-WHITE), TP PB