Bridge & Culvert Project Case Study in Georgia

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Georgia are also available.

Project Overview

Project Title:GADOT BRIDGE CONSTRUCTION CALL ORDER #10
Start Date:2004-07-01
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build bridges & culverts in Georgia depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Georgia
County:Butts
Address:CR 290 Over Tussahaw Crk/Various

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s] LUMP LUMP TRAFFIC CONTROL - BRSTLB-1071(5) 01 1,000.000 HR TRAINING HOURS 2.000 AC TEMPORARY GRASSING 60.000 TN MULCH 2.000 EA CONSTRUCTION EXIT 192.000 LF CONSTRUCT AND REMOVE TEMPORARY PIPE SLOPE DRAIN 32.000 EA CONSTRUCT AND REMOVE TEMPORARY DITCH CHECKS 2,422.000 LF CONSTRUCT AND REMOVE BALED STRAW EROSION CHECK 2,113.000 LF MAINTENANCE OF TEMPORARY SILT FENCE, TP C 32.000 EA MAINTENANCE OF EROSION CONTROL CHECKDAMS/DITCH CHECKS 1,211.000 LF MAINTENANCE OF BALED STRAW EROSION CHECK 2.000 EA MAINTENANCE OF CONSTRUCTION EXIT 2.000 EA WATER QUALITY MONITORING AND SAMPLING 12.000 MO WATER QUALITY INSPECTIONS 4,226.000 LF TEMPORARY SILT FENCE, TYPE C LUMP LUMP GRADING COMPLETE - BRSTLB-1071(5) 01 3,058.000 TN GR AGGR BASE CRS, INCL MATL 71.000 TN AGGR SURF CRS 390.000 TN RECYCLED ASPH CONC 9.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM MATL H LIME 901.000 TN RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2,INCL BITUM MATL & H LIME 570.000 GL BITUM TACK COAT 217.000 SY REINF CONC APPROACH SLAB 4.000 E CONC SPILLWAY, TP 1 1.000 CY CLASS A CONCRETE 66.000 LF SIDE DRAIN PIPE, 18 IN, H 1-10 38.000 LF SIDE DRAIN PIPE, 24 IN, H 1-10 2.000 EA SAFETY END SECTION 18 IN, SIDE DRAIN, 6:1 SLOPE 2.000 EA FLARED END SECTION 18 IN, SIDE DRAIN 2.000 E FLARED END SECTION 24 IN, SIDE DRAIN 131.000 LF SLOPE DRAIN PIPE, 15 IN 10.000 SY STN DUMPED RIP RAP, TP 3, 12 IN 10.000 SY PLASTIC FILTER FABRIC 34.000 EA RIGHT OF WAY MARKERS 14.000 SF HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 3 13.000 SF HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING TP 6 55.000 LF GALV STEEL POSTS, TP 7 83.000 LF GUARDRAIL, TP T 1,275.000 LF GUARDRAIL, TP W 2.000 EA GUARDRAIL ANCHORAGE, TP 1 2.000 EA GUARDRAIL ANCHORAGE, TP 12 4,054.000 LF SOLI TRAFFIC STRIPE, 5 IN, WHITE 4,054.000 LF SOLID TRAFFIC STRIPE, 5 IN, YELLOW 64.000 EA RAISED PVMT MARKERS TP 1 796.000 LF PREFORMED PLASTIC SOLID PVMT MKG, 5 IN, WHITE, TP PB 796.000 LF PREFORMED PLASTIC SOLID PVMT MKG, 5 IN, YELLOW, T PB 4.000 AC PERMANENT GRASSING 10.000 TN AGRICULTURAL LIME 9.000 GL LIQUID LIME 4.000 TN FERTILIZER MIXED GRADE 167.000 LB FERTILIZER NITROGEN CONTENT 3,320.00 SY BITUMINOUS TREATED ROVING, WATERWAYS 3,035.000 SY EROSION CONTROL MATS, SLOPES 6.000 CY FOUND BKFILL MATL, TP II 48.000 CY BRIDGE EXCAVATION, STREAM CROSSING 1,239.000 SY GROOVED CONCRETE ( 377.000 ) LUMP SUPERSTR CONCRETE, CL AA, BR NO - 1 784.000 LF CONCRETE BARRIER 98.000 CY CLASS A CONCRETE 1,130.000 LF PSC BEAMS, AASHTO TYPE II, BR NO - 1 435.000 LF PSC BEAMS, AASHTO, BULB TEE, 63 IN, BR NO - 1 13,193.000 LB BAR REINF STEEL ( 107,964.000 ) LUMP SUPERSTR REINF STEEL, BR NO - 1 570.000 LF PILING IN PLACE, STEEL H, HP 12 X 53 1,130.00 LF PILING IN PLACE, STEEL H, HP 14 X 73 110.000 LF PILING IN PLACE, STEEL H, HP 14 X 89 1.000 EA LOAD TEST, STEEL H, HP 12 X 53 1.000 EA LOAD TEST, STEEL H, HP 14 X 73 1.000 EA LOAD TEST, STEEL H, HP 14 X 89 2.000 EA COFFERDAM LUMP LUMP REMOVAL OF EXISTING BR, STA NO - 25+80 94.000 LF PILE ENCASEMENT, 14 IN PILE 1,200.000 SY STN DUMPED RIP RAP, TP 1, 24 IN 1,200.000 SY PLASTIC FILTER FABRIC