CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Arizona construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$17,749,769,569
Bid Phase:$32,644,000
Post-Bid:$35,173,088,583
Civil Projects (value)
Pre-Bid Phase:$6,892,869,760
Bid Phase:$132,777,653
Post-Bid:$15,379,712,870



Bridge & Culvert Project Case Study in Arizona

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Arizona are also available.

Project Overview

Project Title:AZDOT COTTONWOOD-CAMP VERDE-MOG RIM HWY
Estimated Value:$14,238,200
The cost to build bridges & culverts in Arizona depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arizona
County:Yavapai
City:Ash Fork
Address:Western Dr

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s] Work is located in Yavapai County on State Route 260,beginning approximately 40 feet west of Western Drive in the City of Cottonwood and continuing easterly approximately two miles to Thousand Trails Drive. The project consists of constructing 0.4 miles of five-lane undivided roadway,constructing two miles of new two-lane westbound roadway,overlaying two miles of existing two-lane roadwa and constructing two new bridges. REPRESENTATIVE ITEMS UNIT QUANTITY Remove Bituminous Pavement(Milling)Sq.Yd. 32,473 Roadway Excavation Cu.Yd. 600,345 Aggregate Base,Class 3 Cu.Yd. 22,500 Asphaltic Concrete(SHRP)(End Product)(3/4" Mix)Ton 21,460 Asphaltic Conc Friction Course(Asph-Rubber)Ton 2,212 Pipe,Corrugated Metal(Various Sizes)L.Ft. 2,065 Pipe,Reinforced Concrete(Variou Sizes)L.Ft. 1,562 Pavement Marking(Sprayed Thermoplastic)L.Ft. 111,910 Seeding(Class II)Acre 34 Concrete Curb and Gutter L.Ft. 2,277 Retaining Wall(Soil Nail)Sq.Ft. 9,397 Structural Concrete Cu.Yd. 4,693 Reinforcing Steel Lb. 692,307 Precast,P/S Member(AASHTO Type 6 Modified)L.Ft. 4,760 Drilled Shaft Foundation(60" and 108")L.Ft. 1,434 Contractor Quality Control L.Sum 1 Construction Surveying and Layout L.Sum 1