CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Arizona construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$17,749,769,569
Bid Phase:$32,644,000
Post-Bid:$35,173,088,583
Civil Projects (value)
Pre-Bid Phase:$6,892,869,760
Bid Phase:$132,777,653
Post-Bid:$15,379,712,870



Bridge & Culvert Project Case Study in Arizona

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Arizona are also available.

Project Overview

Project Title:AZDOT WICKENBURG-KINGMAN HWY US-93
Estimated Value:$10,384,400
The cost to build bridges & culverts in Arizona depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arizona
County:Mohave
City:Wickenburg
Address:Tompkins Canyon

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Excavating & Grading, Pavement Markers, Miscellaneous Civil, Sewage Piping Work Is Located In Mohave County, Beginning Approximately 79 Miles North Of The Town Of Wickenburg On US Route 93, Beginning At Milepost 121.32 And Extending Northerly To Milepost 119.46 For A Distance Of Approximately 1.86 Miles. This Project Is A Grade, Drain And Pave Project Which Will Construct A New Four-Lane Divided Roadway, Mill And Replace AC Pavement On Existing US 93, Construct Seve New Reinforced Concrete Box Culverts And Two New Reinforced Concrete Slab Bridges, Signing, Marking, Cacti Revegetation And Other Miscellaneous Work. 001 2020029 REMOVAL OF ASPHALTIC CONCRETE PAVEMENT SQ.Y 907.00000 0020 2020037 REMOVE AND SALVAGE CATTLE GUARDS EACH 3.00000 0030 2020041 REMOVAL OF PIPE L.FT 564.00000 0040 2020048 REMOVAL OF STRUCTURE (REINFORCED CONCRETE BOX CULVERT) EACH 5.00000 0050 2020054 REMOVE (CATCH BASIN) EACH 2.00000 0060 2020057 REMOVE AND SALVAGE (END TERMINAL) EACH 2.00000 0070 2020071 REMOVE GUARD RAIL L.FT 438.00000 0080 2020086 REMOVE BITUMINOUS PAVEMENT (MILLING) (3 1/2 ) SQ.Y 4814.00000 0090 2020101 REMOVE FENCE L.FT 22117.00000 0100 2020112 REMOVE AND SALVAGE GATE EACH 11.00000 0110 2020153 REMOVE (AND RELOCATE MAIL BOXES) L.SU 1.00000 0120 2030301 ROADWAY EXCAVATION CU.Y 404425.00000 0130 2030401 DRAINAGE EXCAVATION CU.Y 21344.00000 0140 2030701 CROWN DITCH L.FT 2994.00000 0150 2090005 FURNISH WATER M.GA 54000.00000 0160 3030022 AGGREGATE BASE, CLASS 2 CU. 24193.00000 0170 3060001 GEOGRID BASE REINFORCEMENT SQ.Y 315.00000 0180 4040111 BITUMINOUS TACK COAT TON 39.00000 0190 4040116 APPLY BITUMINOUS TACK COAT HOUR 144.00000 0200 4040125 FOG COAT TON 9.00000 0210 4040163 BLOTTER MATERIAL TON 28.00000 0220 4040282 ASPHALT BINDER (PG 76-16) TON 1616.00000 0230 4140040 ASPHALTIC CONCRETE FRICTION COURSE (ASPHALT-RUBBER) TON 1962.00000 0240 4140042 ASPHALT RUBBER MATERIAL (FOR AR-ACFC) TON 177.00000 0250 4140044 MINERAL ADMIXTURE (FOR AR-ACFC) TON 90.00000 18.00000 0260 4160004 ASPHALTIC CONCRETE (3/4 MIX) (END PRODUCT) (SPECIAL MIX) TON 32310.00000 0270 4160031 MINERAL ADMIXTURE TON 90.00000 304.00000 0280 5010204 PIPE, CORRUGATED METAL, 28 X 20 L.FT 76.00000