Bridge & Culvert Project Case Study in Arizona

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Arizona are also available.

Project Overview

Project Title:AZDOT BOWIE JUNCTION SAFFORD HWY US191
Start Date:2004-08-01
Estimated Value:$6,000,000
The cost to build water and sewage piping in Arizona depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arizona
County:Graham
City:Safford
Address:Segment IV

Project Type

Building Category:Water and Sewage Piping, Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Sewage Piping REMOVE FENCE L.FT. 32,960 ROADWAY EXCAVATION CU.YD 221,647 FURNISH WATER M.GAL 30,000 AGGREGATE BASE,CLASS 2 CU.YD 15,412 ASPHALT BINDER(PG 64-22)TON 992 ACFC(ASPHALT-RUBBER)TON 2,751 ASPHALT RUBBER MATERIAL(FOR AR-ACFC)TON 248 AC(3/4" MIX)(END PRODUCT)TON 18,723 PIPE CORRUGATED METAL L.FT 4,310 CONCRETE CATCH BASIN EACH 19 HEADWALL EACH 14 TEMPORARY CONCRETE BARRIER L.FT 2,250 TEMPORARY IMPACT ATTENUATORS EACH 22 PAVEMENT MARKING(THERMOPLASTIC)(0.060")L.FT. 110,947 SEEDING(CLASS II)ACRE 56 EROSION CONTROL(SEDIMENT ROLLS)L.FT. 3,397 BARBED WIRE GAME FENCE L.FT. 33,196 RIPRAP(WIRE-TIED)CU.YD 348 STRUCTURAL EXCAVATION CU.YD 2,345 STRUCTURAL BACKFIL CU.YD 3,050 STRUCTURAL CONCRETE CU.YD 3,421 REINFORCING STEEL LB. 473,839 CONSTRUCTION SURVEYING L.SUM 1 ON THE JOB TRAINING HOURS 500