CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Arizona construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$17,749,769,569
Bid Phase:$32,644,000
Post-Bid:$35,173,088,583
Civil Projects (value)
Pre-Bid Phase:$6,892,869,760
Bid Phase:$132,777,653
Post-Bid:$15,379,712,870



Bridge & Culvert Project Case Study in Arizona

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Arizona are also available.

Project Overview

Project Title:AZDOT SANTAN FREEWAY (SR 202L)
Start Date:2004-04-01
Estimated Value:$66,800,000
The cost to build bridges & culverts in Arizona depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arizona
County:Maricopa
City:Mesa
Address:Power Rd - Elliot Rd

Project Type

Building Category:Bridges & Culverts, Excavating & Grading
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Excavating & Grading Clearing and Grubbing Acre 230 Roadway Excavation Cu.Yd. 892,660 Drainage Excavation Cu.Yd. 195,600 Borrow (In Place) Cu.Yd. 2,545,400 Aggregate Base (Class 2) Cu.Yd. 75,674 Portland Cement Concrete Pavement (10" and 13") Sq.Yd. 269,659 Bituminous Material Ton 648 Asphaltic Concrete (3/4" and Base Mix) Ton 12,725 Asphaltic Concrete (Miscellaneous Str.) Ton 5,142 Asphalt Concrete Friction Course (Asphalt Rubber) Ton 25,564 Asphalt Rubber Material Ton 2,429 Pipe, Reinforced Concrete (48") L.Ft. 526 Storm Drain Pipe (18" to 42") L.Ft. 27,499 Catch Basins Each 236 Manhole Each 27 Sign Structure (Cantilever and Bridge) Each 15 Temporary Concrete Barrier (Install and Remove) L.Ft. 5,957 Pol Each 219 Mast Arm Each 168 Electrical Conduit L.Ft. 120,118 Pull Box Each 482 Conductor L.Ft. 391,630 Luminaire Each 244 Topsoil Cu.Yd. 207,000 Pipe, Ductile Iron (4" to 30") L.Ft. 3,172 Casing, Steel (24" to 48") L.Ft. 3,536 Erosion Control Rolls (Wattles) L.Ft. 61,580 Chain Link Fence L.Ft. 42,797 Median Cable Barrier L.Ft. 17,662 Concrete Curb and Curb and Gutter L.Ft. 54,677 Concrete Barrier L.Ft. 13,037 Riprap (Dumped) (12") Cu.Yd. 5,406 Sound Barrier Wall (Masonry) Sq.Ft. 260,825 Retaining Wall Sq.Ft. 36,467 Concrete Channel Lining Sq.Yd. 116,154 Trainees Hour 8,000 Contractor Quality Control L.Sum 1 Construction Surveying and Layout L.Sum 1 Concrete Bridge L.Sum 13 RCB Culvert L.Sum 3