CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Arizona construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$17,749,769,569
Bid Phase:$32,644,000
Post-Bid:$35,173,088,583
Civil Projects (value)
Pre-Bid Phase:$6,892,869,760
Bid Phase:$132,777,653
Post-Bid:$15,379,712,870



Bridge & Culvert Project Case Study in Arizona

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Arizona are also available.

Project Overview

Project Title:VETERANS MEMORIAL OVERPASS DEMONSTRATION
Estimated Value:$20,600,000
The cost to build bridges & culverts in Arizona depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arizona
County:Pima
City:Tucson
Address:Base Line & Gila & Salt River Meridian

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Miscellaneous Civil Consists Of reconstruct Both The Existing Veterans Memorial/Palo Verde Bridge Over 36th Street, UPRR, And Aviation Parkway And Existing Palo Verde Bridge Ove The Tucson Diversion Channel As A Four Lane Divided Arterial Roadway With Turn Lanes In Both Directions, Including Roadway Approaches, Two Signalized Intersections, Access Raodways, Removal Of Tress Existing Bridge Ramps, Construction Of Two New Access Road Bridge Ramps, 4,030 Linear Foot Roadway Wit Median, 2,920 Linear Feet Of Access Raodway, And A 'Park-N-Ride' Facility