CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Alabama construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$6,995,400,266
Bid Phase:$157,488,500
Post-Bid:$29,153,690,270
Civil Projects (value)
Pre-Bid Phase:$1,978,062,339
Bid Phase:$73,287,665
Post-Bid:$9,142,107,127



Auditorium Project Case Study in Alabama

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of auditorium projects in Alabama are also available.

Project Overview

Project Title:LDS CHURCH ALABASTER
Estimated Value:$3,000,000
The cost to build auditoriums in Alabama depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Alabama
County:Shelby
Address:210 Lacey Ave

Project Type

Building Category:Auditoriums
Work Type:New

Project Description:

Church Auditorium, Cathedrals , Choir Room, Classrooms, Computer, Display, Gathering, Meeting Room, Multi Purpose Room, Office[s], Production, Reading, Recording, Records Storage, Restroom, Shipping/Receiving, Stage , Storage, Vehicle Parking Concrete Foundation, Structural Steel Frame, Other Exterior Wall, Metal Deck Roof Structure, Other Roof Deck, Other Roof Type The Site Project Will Include Parking, Lighting, Utilities, Storage Shed, A Satellite Dish, A Storm Water Detention Pond, Two New Driveways. The Building Consists Of A One-Story Church Meetinghouse, Including A Mechanica Mezzanine. The Building Is Classified As Type V-B, (wood frame) Construction With Wood Trusses, Laminated Veneer Lumber, I-Joist And Common Stud Framing Supported On A Slab-On-Grade And Full Footings. Finishes Are Brick Veneer With Aluminum Soffit, Fascia And Siding. Roof Is Fiberglass Shingle. Electrical Phas 120/208V 3 Phase, Mechanical Systems Consist Of Gas Fired Furnaces With Separat Condensing Units. The Building Is Fully Sprinkle Red With An Automatic Fire Sprinkler System Utilizing Wet And Dry Pipe, Interconnected To A Fire Detection/Alarm system. All Materials As Per Construction Manual Specifications Demolition; Clearing/Grubbing; Grading; Storm Drainage; Vinyl Fence; Chain Link fencing; Asphalt Paving; Pavement Marking; Site Water Distribution; Fire Suppression Water Utility; Sanitary Sewerage Utility; Natural Gas Distribution; Landscape; Irrigation; Site Concrete; Footings; Concrete Foundation walls; Slab Reinforcing Steel; Masonry Veneer; Structural Steel; Stainless Steel Pipe Handrails; Galvanized Steel Handrails; Engineered Lumber; Wood Framing; Structural Lumber; Custom Cabinetry; Standing & Running Trim; Bituminous Dampproofing; EIFS; Metal Fascia & Soffit; Gutters And Downspouts; Asphalt Shingles; Ridge Vents; Insulation; Windows; Storefronts; Interior Pre-Finished Wood Doors; Door Hardware; Gypsum Wallboard; Suspended Ceiling (Gypsum Board); Acoustical Ceiling Tile (1x1 Glue-Up Tile); Sisal Wallcovering; Vinyl Wallcovering; Iinterior & Exterior Painting & Staining; Ceramic Tile; Wood Athletic Flooring; Toilet Partitions & Accessories; Engraved Stone Panel Signage; Fire Extinguishers & Cabinets; Accordion Folding Partitions; Curtains Drapes; Sound System; Satellite System; Fire Detection & Alarm; Wet & Dry Pipe Fire Suppression System; HVAC; Plumbing; Electrical;