CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Tennessee construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$9,763,890,777
Bid Phase:$135,636,914
Post-Bid:$42,069,502,336
Civil Projects (value)
Pre-Bid Phase:$644,588,300
Bid Phase:$58,868,138
Post-Bid:$14,360,348,619



Airport Runway Project Case Study in Tennessee

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Tennessee are also available.

Project Overview

Project Title:MSCAA RUNWAY PAVEMENT REHABILITATION
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build electrical work in Tennessee depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Tennessee
County:Shelby
City:Memphis
Address:Runway 9/27

Project Type

Building Category:Electrical Work, Airport Runways
Work Type:New

Project Description:

Runway 9/27 Will Be Improved For Its Entire Length Of Approximately 8,930', Including Shoulders And Bituminous Blast Pads, Portions Of Taxiways A1, V1, C And B Will Be Milled And Resurfaced, Existing Runway And Taxiway Bituminous Surface Courses Will Be Milled To A Nominal Depth Of Three Inches Below The Proposed Finish Grade And Replaced With Three Inches Of Bituminous Surface Course, Areas Of Normal Six Inch Milling And Replacement Where Selected Taxiway Intersect The Runway, Existing Variable Depth Bituminous Shoulder Pavement Will Be Removed And Replaced With Four Inch Bituminous Surface Course, Existing Ston Base Under Shoulder Pavement Will Be Proofrolled, Soft Areas Will Be Removed An Replaced, Additional Stone Will Be Added As Necessary, Base Will Be Graded And Compacted, Pavement Striping And Markings Will Be Restored And Runway Pavement Will Be Grooved, Existing Centerline Lights And Conduit At Intersection Taxiway Will Be Replaced, Existing Runway Edge Lights And Conduit Will Be Replaced, Electrical Circuits Upgraded, New Regulators Will Be Installed In The Electrica Vault.