Airport Runway Project Case Study in Pennsylvania

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Pennsylvania are also available.

Project Overview

Project Title:HARRISBURG INTL - PAGING SYSTEM
Estimated Value:$423,570
The cost to build airport runways in Pennsylvania depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Pennsylvania
County:Dauphin
City:Middletown
Address:208 Airport Dr

Project Type

Building Category:Airport Runways
Work Type:New

Project Description:

Other Structural Frame The work Is To Include All Design, Labor, Material, Tools, Equipment, Insurances, Engineering, Materials Handling, And Transport Required To Furnish And Install The Paging System For And Between The New terminal, Multimodal Transportation Facility And Amtrak Station. The Work Of This contract Shall Include, but Not Be Limited To Devices, Wiring(Including All Final Terminations And Connections), Hardware, Software, Programming, Testing, Commissioning And All associated Work For A Complete System. Each Of The Aforementioned Building Electrical Contractors Are Required To Coordinate The Installation Of All Pagin System Wiring. These Respective Electrical Contractors Will Furnish And Install All Required Conduit And Conduit Connections.