CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Oregon construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$4,280,510,667
Bid Phase:$264,337,500
Post-Bid:$27,953,784,890
Civil Projects (value)
Pre-Bid Phase:$1,137,790,927
Bid Phase:$44,992,250
Post-Bid:$9,640,373,096



Airport Runway Project Case Study in Oregon

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Oregon are also available.

Project Overview

Project Title:JACKSON AIR TRAFFIC CONTROL TOWER
Estimated Value:$3,575,000
The cost to build airport runways in Oregon depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Oregon
County:Jackson

Project Type

Building Category:Airport Runways
Work Type:New

Project Description:

Airport Construction Phase: Excavation , concrete foundation; exterior, precast insulated concrete panels, steel frame structure, steel stud exterior walls with batt insulation, cover board, weather barrier and ceramic rain screen panels; interior, walls - dry wall & paint, floors, sealed concrete - vinyl tile - carpet sqares, steel stair and railings, elevator, hollow metal doors and frames, windows, ground source HVAC system, electical service, distribution, empty conduits -raceways - cable trays to accomodate the phase Two installation and fixtures, site restoration, paving and fencing. Phase Two: (Separate Bid at a future time) Installation and operational equipment including wiring, communication equip- ment, testing and connection to existing airport controls and systems.