CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Ohio construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$32,010,381,278
Bid Phase:$104,640,768
Post-Bid:$58,739,515,159
Civil Projects (value)
Pre-Bid Phase:$5,135,130,044
Bid Phase:$260,079,853
Post-Bid:$24,542,689,950



Airport Runway Project Case Study in Ohio

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Ohio are also available.

Project Overview

Project Title:WRIGHT PATTERSON AIRFIELD PAVEMENT PH I
Estimated Value:$4,595,000
The cost to build airport runways in Ohio depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Ohio
County:Greene
City:Wright Patterson AFB
Address:Wright-Patterson Air Force Base

Project Type

Building Category:Airport Runways
Work Type:New

Project Description:

Airport Construction, Road[s] Construction Services For The C-5 Airfield Pavement Phase 1 Project At Wright-Patterson Air Force Base In Dayton Ohio Which Will Provide Support Of C- Aircraft, The C-5 Aircraft Is Longer And Wider Than The C-17 Aircraft, Which Th Current Apron Is Designed To Support, The Planned Improvements Consist Of Approximately 39,000 Square Yards (17,333 Cubic Yards) Of Concrete Airfield Pavement To Be Installed, An On-Site Batch Plant Will Be Required For The Production Of The Concrete, In Addition To The Concrete Pavement, Asphalt Aprons, Aircraft Rated Trench Drains, Circular And Elliptical Concrete Pipe, An Sub-Surface Drainage Features Will Need To Be Installed, Demolition Of Approximately 25,000 Square Yards Of Asphalt Pavement And The Removal Of Approximately 627 Cubic Yards Of Concrete Will Be Part Of The Project, The Relocation Of Existing Items Such As Light Poles, Lighting Fixtures, Fire Hydrants, And Emergency Fuel Shut Off Valves Will Also Be Required, Relocation Of Other Specialized Systems May Also Be Required