CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Ohio construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$32,010,381,278
Bid Phase:$104,640,768
Post-Bid:$58,739,515,159
Civil Projects (value)
Pre-Bid Phase:$5,135,130,044
Bid Phase:$260,079,853
Post-Bid:$24,542,689,950



Airport Runway Project Case Study in Ohio

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Ohio are also available.

Project Overview

Project Title:DAYTON INT'L AIRPORT CONTROL TOWER-SITE
Estimated Value:$5,520,000
The cost to build air traffic control towers in Ohio depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Ohio
County:Montgomery
City:Dayton
Address:Dayton International Airport Fields

Project Type

Building Category:Air Traffic Control Towers, Airport Runways
Work Type:New

Project Description:

Air Traffic Control Tower Site Preparation For New Dayton International Airport Air Traffic Control Tower Landside And Airside Site Infrastructure Relocation; Construction To Support Th Proposed Air Traffic Control Tower; Relocation Of An Existing Jet-A Fuel Facility; Demolition And Removal Of Underground Storage Tanks; Installation Of Two 8" And One 12" Jet-A Fuel Line; Installation Of An 8" And 12" Water Main; Installation Of A Ductile Iron Storm Sewer; Construction Of Concrete Pavement; Asphalt Resurfacing; Installation Of Various Sizes Of PVC Conduit Cabling