Airport Runway Project Case Study in Illinois

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Illinois are also available.

Project Overview

Project Title:ILDOT MAIN TAXIWAY CONCRETE G A RAMP
Estimated Value:$703,362
The cost to build airport runways in Illinois depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Illinois
County:Mcdonough
Address:Macomb Municipal Airport

Project Type

Building Category:Airport Runways
Work Type:New

Project Description:

Airport Construction Construct New Concrete G.A. Ramp Expansion South of the Main Taxiway - which includes the following major work items:1 Each Apron Light Pole w/Triple Fixture;2,100 L.F. 1/C #8 XLP-USE;7,470 L.F. UG Cable in UD;940 L.F. 12 Pair Control Cable;1 L.S. Install Electrical Equipment;530 L.F. 4" Directional Bore;300 L.F. 4-Way Concrete Encased Duct;4 Each Electrical Handhole;1 L.S. Haul Route;1,602 C.Y. Unclassified Excavation;8,942 S.Y. Separation Fabric;3,085 Ton Crushed Agg. Base Course;130 S.Y. Remove&Replace Bit. Pavement;8,915 S.Y. 6" PCC Pavement;1,436 S.F. Pavement Marking-Waterborne;159 L.F. 18" RCP,Class IV;0.50 Acre Seeding&Mulching