CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Illinois construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$37,206,289,937
Bid Phase:$363,384,660
Post-Bid:$88,028,209,476
Civil Projects (value)
Pre-Bid Phase:$7,728,134,605
Bid Phase:$75,964,996
Post-Bid:$34,921,454,367



Airport Runway Project Case Study in Illinois

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Illinois are also available.

Project Overview

Project Title:ILDOT RUNWAY 2/20
Estimated Value:$2,561,790
The cost to build airport runways in Illinois depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Illinois
County:Will
Address:Lewis University Airport

Project Type

Building Category:Airport Runways
Work Type:New

Project Description:

Airport Construction Construct Runway 2/20 Extension and Turnaround - which includes the following major work items:Base Bid:9,690 L.F. UG Cable in UD;273 L.F. Conc. Encased Duct;4 Each Electrical Handhole;27 Each MITL-Stake Mounted;4 Each Taxi Guidance Sign;11 Each MIRL,Stake Mounted;1 Pair Relocate REILs;1 Each Relocate PAPI;1 L.S. Relocate Localizer;10,050 C.Y. Unclassified Excavation;6,650 C.Y. On Site Borrow;200 S.Y. Riprap;325 S.Y. 6" Agg. Base Course;24,100 S.Y. Crushed Agg. Base Course;23,565 S.Y. 10" PCC Pavement;12,450 S.Y. PCC Pavement Grooving;23,960 S.F. Pavement Marking-Epoxy;21,290 S.F. Pavement Marking Removal;265 L.F. 18" RCP,Class IV;780 L.F. 6" Perforated Underdrain;460 L.F. Remove Underdrain;1,470 L.F. Telephone Cable,Direct Bury;8.9 Acre Conservation Cover;11.3 Acre Seeding;6,050 C.Y. Topsoiling(from on site);20.2 Acre Mulching,Add. Alt.1:320 S.Y. Riprap;235 L.F. Storm Sewer;4 Each Underdrain End Section;4 Each Perforated Riser(10");275 S.Y. Erosion Mat-Ditch Bottom