CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Illinois construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$37,206,289,937
Bid Phase:$363,384,660
Post-Bid:$88,028,209,476
Civil Projects (value)
Pre-Bid Phase:$7,728,134,605
Bid Phase:$75,964,996
Post-Bid:$34,921,454,367



Airport Runway Project Case Study in Illinois

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Illinois are also available.

Project Overview

Project Title:ILDOT RUNWAY 13/31
Estimated Value:$2,906,830
The cost to build airport runways in Illinois depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Illinois
County:Sangamon
City:Springfield
Address:Abraham Lincoln Capital Airport

Project Type

Building Category:Airport Runways
Work Type:New

Project Description:

Airport Construction Construct Runway 13/31 RSA Improvements;Extend Taxiway B - Which Includes The Following Major Work Items:1 Each Airport Rotating Beacon;29,950 L.F. UG Cable In UD;2,400 L.F. REIL Homerun;1 L.S. Vault Modifications;2 Each 20 KW Regulator,Style 2;1 L.S. Lighting Control System;290 L.F. 4-Way Concrete Encase Duct;64 Each MITL-Base Mounted;12 Each Taxi Guidance Sign;64 Each HIRL,Base Mounted;24 Each HI Threshold Light Base Mounted;13 Each Runway Distance Remaining Sign;111 Each Remove Mounted Light;8 Each Remove Taxi Guidance Sign;1 Each Relocate PAPI;40 Each Replace Sign Face;1 L.S. Surface Sensor Upgrade;24,000 C.Y. Embankment In Place;8,850 C.Y. Topsoil Stripping;11,400 S.Y Soil Processing-8";5,000 L.F. Silt Fence;9,460 Ton Bit. Base Course;16,000 S.Y. Crushed Agg. Base Course;2,800 Ton Bit. Surface Course;7,950 Gal. Bit. Prime Coat;171,350 S.F. Pavement Marking;45,000 Pavement Marking Removal;1,303 L.F. RCP;3,080 L.F. 4" Perforated Underdrain W/Sock;2 Each Inlet-Special;19 Acre Seeding&Mulching;3,365 S.Y. Sodding